Improvement Loan Project: Ararat-2 Substation Reconstruction

electricity transmission network improvement loan n.w
1 / 4
Embed
Share

"Learn about the Electricity Transmission Network Improvement Loan Project focused on the reconstruction of the Ararat-2 substation. The project aims to enhance reliability, reduce outages, and improve operational efficiency. Find out more about the objectives and expected outcomes of this important endeavor."

  • Electricity
  • Transmission
  • Network
  • Improvement
  • Reconstruction

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Electricity Transmission Network Improvement Loan Project Reconstruction of 220/110/6 kV Ararat-2 substation

  2. Project Main Data Contract price 13,138,984 8 USD dollar Financing organization International Bank of Reconstruction and Development (IBRD) General Contractor Kaskad Energo LLC The substation is under operation from 1975, located in the Ararat region, occupies an area of 4.6 ha Works to be done Reconstructionof220,110 kV OSYs and their partial replacement Reconstructionof6kVCSGbuilding,replacementof6kVcells Replacementoftwoautotransformersandtwoboosttransformers Reconstructionofcontrolandwarehousebuildings Modernization and digitization of RPA equipment and SCADA system Landscaping of substation area, reconstruction of fence, installation of video surveillance system Completion of works is foreseen in 2024. http://www.hven.am/

  3. Project Objective Increase the reliability and safety of the power transmission network, reduce the number of emergency outages, increase the reliability of uninterrupted electricity supply to consumers, reduce the costs of substation operation as well. http://www.hven.am/

  4. Expected outcome As a result of the Project implementation, the reliability of the power transmission network will be increased and the number of emergency outages will be reduced, the reliability of uninterrupted electricity supply to consumers will be increased, and the operating costs of substations will be reduced. http://www.hven.am/

Related