Improvements to ERS Testing Requirements - NPRR 1060 Summary
"Discover the key changes in NPRR 1060 focusing on ERS testing requirements. Clarity enhancements and adjustments for generators and resources are highlighted, ensuring efficient testing processes and program alignment."
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
NPRR 1060: Improvements to ERS Testing Requirements and Other ERS Items Protocol Revisions Subcommittee January 14, 2021
NPRR 1060 summary of changes In the NPRR summary items below and in the proceeding slides, the four items that are italicized with blue highlights indicate changes to the ERS program. The remaining items are primarily for clarification. 1. ERS Generator metering requirements a) Moved and rephrased ERS Generator metering requirements from Section 8 to Section 3 to improve clarity and consolidation 2. Co-located Resources test/event performance a) Rearranged paragraphs and simplified the language for co-located Resources related to self-serve capacity limits and separate evaluations for Loads on alternate baselines to improve clarity 2 PUBLIC
NPRR 1060 summary of changes 3. Time Period Availability Loads a) Simplified language referring to unavailability to improve clarity and relocated language from TRSOW addressing missing meter data b) Corrected language referring to ERS Contract Period to ERS Standard Contract Term 4. Time Period Availability Generators a) Changed planned maintenance requirements for ERS Generators to align with requirements for ERS Loads and integrated self-testing into planned maintenance to improve efficiency b) Relocated metering requirements to Section 3 c) See sub-bullet a) from item 3 above d) See sub-bullet b) from item 3 above 3 PUBLIC
NPRR 1060 summary of changes 5. Testing All Resources a) To account for multiple events within a SCT, modified requirement from passing any event to passing all events for a resource to avoid testing b) Simplified language related to a resource that has passed all events in the SCT and moves from ERS10 to ERS30 does not need to be tested c) Replaced the word Load with Resource for clarification d) Added testing requirement if sites within a single Premise are in more than 1 resource all resources will be tested e) ERS Co-located resources Added language to clarify that separate evaluations are not considered jointly 4 PUBLIC
NPRR 1060 summary of changes 6. Resource performance during events a) Modified requirement so ERSTESTPF will be changed to 1 (pass) if the resource passes all events, rather than any event during an SCT 7. QSE Availability and Event Performance clarity improvements a) Reworded and rearranged structure for QSE Availability b) Reworded and rearranged structure for QSE Event Performance c) Added table with variable definition 5 PUBLIC
Timeline 1. PRS Language Consideration 01/14/21 2. WMS 02/03/21 3. PRS Impact Analysis Review 02/11/21 4. TAC Consideration 02/24/21 5. Board Consideration 04/13/21 6. Effective date (JunSep21 SCT) 06/01/21 6 PUBLIC
Questions? ON OFF Contact ERS@ercot.com with additional questions 7 PUBLIC