Innovative Battery Saver Project by C.H.A.D. Industries
Explore a revolutionary project addressing the global issue of wasted batteries, focusing on transferring residual voltage to power other circuits. Reduce chemical waste, increase recyclable energy, and enhance energy production with this sustainable solution.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Battery Saver Project By: C.H.A.D. Industries
Problem Statement - - - - - 3 Billon batteries are thrown away per year 1.3 Volts left in every dead battery 4.45 Billion watts of energy wasted every year Increased chemical waste around the world Wasted supplies for batteries
Proposal - - - Remove voltage from dead battery Transfer remaining voltage to another battery Transfer remaining voltage to power another circuit Result - - - Reduction of Chemical Waste Increased Recyclable Energy Increased Energy Production
Project Test Plan #1 Outline Integrated charging circuit Automatically cuts off when battery reaches full capacity. Experimenting with correct voltage and current that will turn the circuit off. Problem Finding proper resistor size to provide proper voltage LED did not turn on due to backflow into battery Solution Using diode to reduce backflow to the battery
Project Test Plan #2 Outline Problem Solution