
Innovative Cybersecurity Industry Call for Singaporean Companies
"Participate in the CSA Cybersecurity Industry Call for Innovation with funding opportunities from the Co-Innovation and Development Fund. Address key Challenge Statements and showcase your technological innovation to enhance cybersecurity. Ensure compliance with guidelines and secure up to S$1M in funding for your project."
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
CSA Cybersecurity Industry Call for Innovation (CyberCall) Submission Template Project Title: Full Company Name: Project End User: CSA CyberCall Submission Template v11.0
Notes to Applicant 1. Follow the slide template sequence strictly, i.e. do not change it 2. Each proposal should only respond to ONE Challenge Statement 3. All questions must be answered and preserved, i.e. do not delete any questions 4. Do not exceed 20 slides (excluding title slide, instructions/guidelines, separators, Thank You slide) 5. Convert the slides to pdf before submission 6. Maximum file size for submission: 7MB 2 CSA CyberCall Submission Template v11.0
CSA CCDF Guidelines Extract of CSA Cybersecurity Co-Innovation and Development Fund (CCDF) guidelines No retrospective applications will be accepted An application is deemed retrospective if the proposed project has already commenced at the time of application There must be development of new features, not just integration/configuration of existing products/solutions At least 50% of manpower requested for funding must be Singaporean or Singapore PR All Singapore registered companies are eligible for the CSA CCDF Overseas firms that are not registered in Singapore will need to partner with a Singapore registered company Funding awarded must be used to carry out development activities physically in Singapore Recipients of CCDF funding should use Singapore as a base to own, manage and register all intellectual property developed during the project Proposals already funded or considered for funding by other government agencies will not be considered for CCDF All claims will be disbursed on a reimbursement basis upon submission of claim document(s) such as salary slips, invoices etc. Please refer to https://www.csa.gov.sg/programmes/co-innovation-development-fund for the full guidelines 3 CSA CyberCall Submission Template v11.0
Project Title: Company Name: Project Quad Chart Objectives / Deliverables Challenge Statement State the Challenge Statement proposal addresses CS01 to CS07: State CS number and copy Challenge Statement title here For CSOC (Open Category), state the Challenge Statement title in 10 words Objective Main objective (in 30 words) Deliverables Key deliverables upon project completion. TRL (Technology Readiness Level based on NASA definition) Start TRL = <>; Projected End TRL = <> Summary Illustration A visually appealing picture or graphic that represents the key innovative technological idea(s) or potential outcome of the project Approach and Innovation* Proposed Approach <> <> Funding and Schedule Funding Requested (Max S$1M): <S$ ____> Total Project Cost: <S$ ____> Schedule (Max 24 months): 4 significant project milestones Innovation In one sentence, describe the innovation aspects of this proposal (E.g first in the world type of solution, filing patents, best features compare to world products etc) Month 1 Month 12 Month 6 Month 24 Month 18 <4. Completion> Start <Milestone 1 > <Milestone 2 > <Milestone 3 > *This section is mandatory and will be important for the evaluation 4 CSA CyberCall Submission Template v11.0
1. Project Overview Summary a) What problem is this proposal trying to solve? (OUTLINE the issue that this proposal wants to solve that cannot be solved by any current market products) b) How does the proposed solution solve the problem? (Summary of WHAT the solution does. What outcome will be solution expect to bring ) 5 CSA CyberCall Submission Template v11.0
2. Innovation a) What is the innovation of the proposed solution? (New methods, ideas, technologies or extensions of existing technology. Significant improvements and impact that the solution may result in.) b) Market comparison on the proposed solution (Outline any Unique Selling Points (USP) and market differentiating features of the proposed solution. List the exact name of market products that you are comparing.) No Features [Example] Full Duplex speed of 100Gbps 1 2 3 4 5 6 7 Your Solution Yes Solution A No Solution B No 6 CSA CyberCall Submission Template v11.0
3. Project Technical Details a) Challenge Statement compliance (Delete this slide if it is for Open Category. State requirements as per the target Challenge Statement. Provide reasons for any requirements not complied with) No. Requirement Complied Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No 7 CSA CyberCall Submission Template v11.0
3. Project Technical Details (Cont) b) How does the proposed solution work? How will it be implemented? Outline any existing/ external ready-made components in BLUE. Outline new components to be developed in this proposal in RED 8 CSA CyberCall Submission Template v11.0
3. Project Technical Details (Cont) c) What are the project outputs or key deliverables upon project completion? (Endpoint software, backend software, hardware appliance, endpoint appliance) No. Key Deliverables and Specifications 1 2 3 4 5 6 7 8 9 10 9 CSA CyberCall Submission Template v11.0
4. User Acceptance Test a) What is the test setup? (include diagram to explain) 10 CSA CyberCall Submission Template v11.0
4. User Acceptance Test (Cont) b) What are the test cases and passing criteria ? No. 1 2 3 4 5 6 7 8 9 10 Test Case and Objective Passing Criteria 11 CSA CyberCall Submission Template v11.0
5. Project Business Plan a) Which industry sector(s) and geographical region(s) will the solution target b) What is the budgetary pricing of the solution after the project has been completed successfully? (Include system cost, annual maintenance and/or support pricing. Price for new customer, and discount for current end user) One-Time- Annual Recurring Cost/OPEX (S$) Price/Discount for current No Description of components Cost/CAPEX (S$) End User 1. 2. 3. 4. c) What is the estimated international addressable and serviceable market size for the solution? (Provide numerical estimates (e.g. market size). State any assumptions. List information sources used (e.g. Forbes, IMDA)) Estimated International addressable market: S$ Estimated international serviceable market: S$ Source: 12 CSA CyberCall Submission Template v11.0
6. Work Packages, Project Timeline, Milestones and Deliverables Months (T + N) Work Packages No. Deliverables & Remarks 1 2 3 4 Milestone 1: Completion of < > 5 6 7 8 Milestone 2: Completion of < > 9 10 11 12 Milestone 3: Completion of < > 13 14 15 16 Milestone 4: Completion of < > T + 6 T + 12 T + 18 T + 24 13 CSA CyberCall Submission Template v11.0
7. Project Budget Breakdown Category Description Total Amount (S$) A. Expenditure on in-company Manpower (EOM) (Will be reimbursed via validation of salary documents) Example Software Engineer: $30,000 (6 mths x $5,000) Hardware Engineer: $30,000 (6 mths x $5,000) B. Expenditure on Third Party expenses such as purchases of Equipment/Software/hardware/Professional Services (Will be reimbursed via validation of invoice documents) Example Web Application Firewall: $4,000 Network Firewall: $3,000 Hardware Security Module (HSM): $7,000 C. Other Operating Expenses (OOE) Total Funding Requested (A+B+C) D. Self-Funding (e.g. manpower, equipment) that the Applicant Company and/or collaborators (if any) will self-fund Example Consultant: $30,000 (6 mths x $5,000) Project Manager: $30,000 (6 mths x $5,000) New Logic Analyser: $5,000 Total Self-Funding (D) Total Project Cost (A+B+C+D) 14 CSA CyberCall Submission Template v11.0
8. Project Team S/N Name, Designation Nationality/ Working in which Country Company Years of experience Funding Needed (Y/N) Involve in which work packages. Job scope in project (list at least 2-3 points) Software Developer for A, B, C System testing for A, B, C Report writing E.g George Tan, Senior Engineer French/Singapore ABC 10 Y 1 2 3 4 5 6 7 8 15 CSA CyberCall Submission Template v11.0
9. Company Background No Category Sub-category Value 1 Full company name 2 Company global headquarter Country Global (exclude SG) 3 Years of establishment Singapore Global (exclude SG) 4 Number of employees Singapore Key products/services 5 Core business activities Existing clientele Shareholding Structure No 1 2 3 4 Share Holder Name Percentage of Holding Nationality 16 CSA CyberCall Submission Template v11.0
10. Others a) Any other considerations that will bring merit to the proposed solution 17 CSA CyberCall Submission Template v11.0
Thank You CSA CyberCall Submission Template v11.0