Innovative Production Strategies for Turbo compressors Enhancement

production n.w
1 / 23
Embed
Share

Explore how Danfoss Turbocor is revolutionizing commercial compressors production through advanced assembly lines, operational efficiency improvements, and addressing challenges and opportunities in the industry. Presented by Andrea Isaza and Andrew Hartsfield.

  • Production
  • Compressors
  • Assembly Lines
  • Operational Efficiency
  • Industry Challenges

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Production Alvaro Silva Andrea Isaza Andrew Hartsfield

  2. Introduction Danfoss Turbocor creates commercial compressors Challenge from sales team 6,200-6,500 to 10,000 $57 million Presented by: Andrew Hartsfield 3

  3. Scope Pre-Mechanical and Mechanical Assembly Lines Assumptions: Warehouse Delivery Time Rework Budget Presented by: Andrew Hartsfield 4

  4. Threats Opportunities Decrease in operator and machine costs to manufacture item Increase in operator satisfaction Lower compressor price/ more profit per unit Production costs will remain the same and could go up Loss of profit Loss of revenue due to downtime without the potential profit Short Term Entrance of another competitor Loss of opportunity profit Losing customers because of inability to produce Increase in profit Increase in demand from lower prices Increase in sales and brand recognition Long Term Presented by: Andrew Hartsfield 5

  5. SIPOC Diagram Supplier Input Process Output Customer College of Engineering Knowledge, training DMAIC Process to improve assembly line, measure tahkt times to reveal bottlenecks, improve bottleneck station product cycle time Assembly line that will produce 10,000 units per year and that will operate 20% more efficiently FAMU-FSU College of COE and IME Department Danfoss Turbocor, operators in line after mechanical line. Danfoss Turbocor Assembly Line, Resources, Knowledge, Personnel Presented by: Andrew Hartsfield 6

  6. Pre-mechanical Assembly Housing Prep Warehouse Oven Insertion Stator Housing Measurements Common Components Assembly Stator Connecting and Testing Housing Cooling Presented by: Andrea Isaza 7

  7. Mechanical Assembly Impeller and Diffuser Insertion and Securing Housing Measurements Radial Bearing Insertion Mechanical Hardware Levitation and Calibration Feed-Though Installation Shaft Insertion Presented by: Andrea Isaza 8

  8. Presented by: Andrea Isaza 9

  9. House Of Quality Presented by: Andrea Isaza 10

  10. Presented by: Andrea Isaza 11

  11. Presented by: Andrea Isaza 12

  12. Presented by: Andrea Isaza 13

  13. Presented by: Andrew Hartsfield 14

  14. Business Analysis Budget is not explicit Cost of stopping production given by the following expression: Presented by: Alvaro Silva 15

  15. Environmental Impact Current manufacturing impact on environment What is the impact on nearby communities? Are there any toxic by-products? Compressor s impact on the environment Magnetic bearing benefits Management of power draw Presented by: Alvaro Silva 16

  16. Ethical Considerations Again, environmental considerations How are communities affected? How large is the compressors footprint? Are there any toxic by-products generated by manufacturing the compressor? Safety considerations Is the company putting the well-being of its workers as its top priority? Equality Does the company ensures equal opportunity when hiring new employees? Presented by: Alvaro Silva 17

  17. Social and Political Consideration Resistance to change Irrelevant to new interactions made Considerations for ease transitioning to new procedures Presented by: Alvaro Silva 18

  18. Sustainability Efficient operations Costs kept low Maximized profit per product Healthy workspace Employee satisfaction Employee well-being Environmental awareness Reassess periodically Company s needs change Presented by: Alvaro Silva 19

  19. SWOT Analysis Strengths Small manufacturing plant changes. Easy to implement Team's motivation Weaknesses Resistance to change Team's lack of experience Internal Factors SWOT Matrix Danfoss Production Opportunities Access to COE faculty members COE technological resources (Software) Threats External Factors Budget cuts by external factors Negative Positive Presented by: Alvaro Silva 20

  20. Risk Matrix Risk Severity Risk Catastrophic (A) Negligible (E) Probability Critical (B) Moderate (C) Minor (D) 5- 5A 5B 5C 5D 5E Frequent 4- Likely 4A 4B 4C 4D 4E 3- 3A 3B 3C 3D 3E Occasional 2- Seldom 2A 2B 2C 2D 2E 1- 1A 1B 1C 1D 1E Improbable Presented by: Alvaro Silva 21

  21. Assessment Risk Index Assessment Risk Index Criteria Accountability Unacceptable under existing circumstances requires immediate action Manageable under risk control Acceptable after review. Requires tracking and recorded action plans Acceptable with continued data collection and trending for continuous improvement. 5A,5B,5C,4A,3B,3A All team members 5D,5E,4C,3B,3C,2A,2B All team members 4D,4E,3D,2C,1A,1B Individuals 3E,2D,2E,1C,1D,1E Individuals Presented by: Alvaro Silva 22

  22. Conclusion Findings Next step: Measure Phase Presented by: Andrew Hartsfield 23

  23. Questions Presented by: Andrew Hartsfield 24