
Innovative Project Team and Methodology Time Update
"Explore a project involving team members, methodology updates, and insightful results showcasing the impact of integration techniques. Witness the difference in estimators and pendulum angle scenarios. Dive into this intriguing study now!"
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Project Title Team Members Names 1
Overview Project Description 2
Methodology Time Update ??+1= ? = ? ?,? Done with Euler or Runge-Kutta Integration Time Update ? = ?????(?? ??+1= ??+1+ ? ? ??+1,? Note you must recalculate L each time, why Because AJ and CJ change based on x ?,???,?_???)? 3
Results 20 and ? =0 0 Initialized ? = 0 Notice the pendulum angle reaches zero exactly the same in both scenarios. However, notice how much longer the estimator takes to reach the actual angle on the design on the right. ? = 99 4975 19? ? = 19 175 ? = 156 99? ? = 4876 4