Innovative Rube Goldberg Project Proposal Presentation for Summer 2019 Team
"Explore the detailed project proposal presentation by the Rube Goldberg team for a unique machine task. Includes design descriptions, budget breakdown, safety considerations, and timeline. Follow their creative journey through images and cost analysis."
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Final Proposal Presentation Rube Goldberg Team Summer 2019 Jassem Alhaddad Ali Alrashidi Omar Aldhafeeri Ali Almari Mohammed Albanaqi Abdullah Alsayeh 1
Project Description Design Description Overview Design Requirements Changes Bill of Material 2 Budget
Rube Goldberg is a machine that performs a very simple task in a very complex fashion, usually including a chain reaction. Project Description The objective is to create a reliable and resettable machine of Rube Goldberg steps. 3
Design Description 4
Cost Safety Realistic Size (10 * 10 ft^2) Resettable Timing Animals Flammable Noise Design Requirements 5 Abdullah
Gantt Chart Omar Aldhafeeri
Dominos steps using electromagnet Pull roll using gravity Hair Drier Pascal Law Lever Convert Belt Changes
Expense Details Cost $1500 Total Budget $1000 Anticipated Expenses Budget $130 Actual Expenses We are currently on schedule $1272 Resulting Balance 9 Mohammed Albanaqi
Items Quantity Cost Reference Wild wire 2 $15 Home depot White peg board 1 $22 Home depot Balls 10 $6 Walmart Fan 1 $15 Walmart Budget Cont d Light switch 1 $9 Walmart Way paddle switch 1 $3 Walmart Light control 1 $6 Walmart Flex funnel 1 $6 Autozone Softwood board 1 $48 Home Depot Total $130 10 Mohammed Albanaqi
[1]BarD Software s.r.o, Build - GanttProject Docs, Ganttproject.biz, 2018. [Online]. https://docs.ganttproject.biz/development/build/ [2] Rube Goldberg Home of the Official Rube Goldberg Machine Contests. Rubegoldberg.Com, 2018, www.rubegoldberg.com/. Accessed 11 July 2019. [3]Nau.Edu,2019,nau.edu/visual-identity-guide/wp- References content/uploads/sites/121/2018/09/NAU_Acronym_Horiz_1Line- 281_3514-1024x50.png. Accessed 11 July 2019. 11