Innovative WP5 Summary with Technical Use Cases for Integration
"Explore a comprehensive overview of WP5 tasks and leaders, emphasizing the need for fast progress, input from partners, and cross-WP collaborations. Dive into technical use cases for seamless system integration."
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Summary of WP5 Giacinto DONVITO INFN-Bari Lukasz Dutka Cyfronet
Task leaders 5.1 UPV (Ignacio Blanquer) 5.2 INFN (Andrea Ceccanti) 5.3 INFN (Giacinto Donvito) 5.4 Cyfronet (Lukasz Dutka) 2
Overall picture Very wide and diverse experiences Very fruitful meeting Inputs from few partner still missing some of those provide input informally We need to proceed very fast: Subtask T5.1.1 [M1 technologies [M1- -M4] M4] (July 2015): Analysis and state of the art of PaaS Subtask T5.3.1 [M1 algorithms [M1- -M5] M5](Aug 2015): Requirements of application scheduling D5.1, Month 5 Month 5 (R, PU) (Aug 2015): State of the art for the technologies at the base of PaaS architecture [UPV] 3
Input/output from/to other WPs We need to exchange ideas with WP3 in order to understand which tools sw solutions procedure we foreseen for managing sw/code We will have: completely new sw external sw modified sw 4
Input/output from/to other WPs We (WP6-5-4 together) need to have very soon meeting with the user- communities in order to start discussing about the use-cases before the official requirements documents is ready we hope this will help also the users to write down their requirements JRA WPs should meet personally (maybe in June) in order to discuss about the overall architecture very small group WP leaders + some technical experts 5
Input/output from/to other WPs We need to have few cross-WP task forces we already identified at least: AAI Deploying Services and Applications Storage access and interfaces Monitoring/accounting and information system We already starting discussing how to organize the work bi-weekly phone conf by tasks frequent and agile call among task leaders We are building a list of requirements in terms of tool for managing the project and running the activities 6
Technical Use Cases We need to prepare a set of Use Cases for better understanding technical integration of the system components asap. Use Cases should be at "Hello World" level Use Cases should integrate all components but not necessarily integrate all the components in one story. 7