Integrating Energy Efficiency in Rental Housing Standards

Integrating Energy Efficiency in Rental Housing Standards
Slide Note
Embed
Share

Proposed integration of energy efficiency and weatherization in rental housing standards through existing regulations, with a focus on weatherization specifics, compliance criteria, implementation details, and next steps for enforcement.

  • Energy Efficiency
  • Weatherization
  • Rental Housing
  • Compliance
  • Enforcement

Uploaded on Mar 09, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. The Minimum Housing Standard for Rental Properties Integrating Energy Efficiency and Weatherization

  2. What is Proposed? Use existing Minimum Housing Standard (MHS) Apply crucial elements of Time of Sale (TOS) DPI is enforcement body 2

  3. What Are the Weatherization Specifics? Apply crucial elements of Time of Sale (TOS) 50,000 BTUs/sf Exterior walls Open attics/ceilings/roofs Accessible heating and cooling ducts and water piping Windows and doors General air leakage via large gaps and holes.

  4. Who Would Need to Comply? Buildings that use over 50k BTU Buildings that have not participated in Weatherization Program Photo from CVOEO Weatherization Program 4

  5. How does it Work? $2,500 cap Annual CPI adjustment If subsequent work required no cost cap 5

  6. What Are Next Steps? DPI and BED Determine: Compliance schedule Enforcement process Data sharing and collaboration 6

Related


More Related Content