Introduction to CORE Workshop for Compact Detector at SBU

kick off workshop for compact detector n.w
1 / 8
Embed
Share

Join the CORE workshop at SBU on March 29-30, 2021, to explore organizing principles, additional aspects, mid-life upgrade options, and collaboration proposals in the field of nuclear science. Learn about detectors, collaboration opportunities, and building a strong research community.

  • Workshop
  • Nuclear Science
  • Detectors
  • Collaboration
  • Research

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Kick-Off Workshop for COmpact detectoR for Eic (CORE) 29-30 March 2021 Hosted by SBU Center for Frontiers in Nuclear Science INTRODUCTION TO CORE WORKSHOP CHARLES E. HYDE* OLD DOMINION UNIVERSITY *Support from DOE DE-FG02-96ER40960 SBU-CFNS BNL Generic Detector R&D SURA/CNF

  2. ORGANIZING PRINCIPLES OF CORE All Si Tracker Compact Solenoid 2? PbWO4 EMCal hpDIRC in Barrel dual-RICH in Ion EndCap

  3. ADDITIONAL ASPECTS OF CORE CORE in Fun4All (B. Smookler) Ample space in forward Barrel and ion-Endcapfor EMCAL Compact size HCal & Muon detection as required by physics Complete Roll-In, Roll-Out? Move quads closer for higher luminosity? Option for high field Solenoid

  4. MID-LIFE UPGRADE OPTIONS (AFTER FIRST 5-10 YEARS OF OPERATION) DIRC Photosensor timing beyond 100 ps rms could increase the momentum reach of the DIRC, even at day 1 Advances in low-noise SiPMs could enable DIRC operation in very high magnetic fields. New Cherenkov metamaterials: Compact PID with (n-1) = (4 20) 10 4 V.Ginis PRL 113 (2014) 167402 Smaller pixel size Si Tracker upgrade

  5. EIC CALL FOR COLLABORATION PROPOSALS FOR DETECTORS (HTTPS://WWW.BNL.GOV/EIC/CFC.PHP) DETECTOR 1 IS WITHIN THE SCOPE OF THE EIC PROJECT AND SHOULD BE BASED ON THE YELLOW REPORT (YR) AND THE CONCEPTUAL DESIGN REPORT (CDR) . IT IS CURRENTLY PLANNED TO BE LOCATED AT INTERACTION POINT 6 (IP6) ON THE RELATIVISTIC HEAVY-ION COLLIDER. DETECTOR 2 COULD BE A COMPLEMENTARY DETECTOR WOULD RESIDE AT A DIFFERENT INTERACTION POINT FROM DETECTOR 1. IS CURRENTLY NOT WITHIN THE EIC PROJECT SCOPE. ROUTES TO MAKE DETECTOR 2 AND A SECOND INTERACTION REGION POSSIBLE ARE BEING EXPLORED. THE PROPOSALS SHOULD INCLUDE TWO PARTS: A DESCRIPTION OF THE SCIENCE ADDRESSED AND PERFORMANCE ESTIMATED THROUGH SIMULATION THE R&D NEEDS, RISKS, AND, IF APPLICABLE, ADOPTION OF EMERGING NEW TECHNOLOGIES. A COLLABORATION ROSTER AND STRUCTURE, TIMESCALE AND COST (INCLUDING POTENTIAL SOURCES OF FUNDING SOURCES AND ASSUMPTIONS), AND POTENTIAL UPGRADE PATHS.

  6. BUILDING A COLLABORATION All are welcome Today is just a Coming-out-Party We will soon ask for people to officially declare interest Participation in CORE does not exclude participation in any other detector proposal One major decision we need to make soon: Is this a Detector-1 Proposal (Included in Project Budget)? Is this a Detector-2 Proposal (Not included in Project Budget)?

  7. POSSIBLE COLLABORATION STRUCTURE Contact Person(s) Proposal Editorial Board Budget/ Personnel Board Detector Design Coordinator Membership Simulations Coordinator Subsystem Tracker DIRC PbWO4 dRICH Forward HCAL Coordinator Institutional Board Process Exclusive JETS SIDIS Tagging Lead Nomination Committee Charter Committee

  8. CORE COLLABORATION TIMELINE JULY 2021 TECHNICAL PERFORMANCE EVAL. DRAFT OF SUB-SYSTEM TEXT INITIAL COSTING AUGUST 2021 FULL SIMULATIONS COLLABORATION STRUCTURE DEF N APRIL 2021 INITIAL MEMBERSHIP, CHARTER COORDINATORS MAY 2021 CHARTER RATIFICATION ELECTIONS (AS PER CHARTER) SUB-SYSTEM TOP-LEVEL DECISIONS SIMULATION STRATEGY/ FRAMEWORK JUNE 2021 FINAL DESIGN DECISIONS INITIAL SIMULATIONS SEPTEMBER 2021 FINALIZE COSTING DEFINE TDR ROLES / RESPONSIBILITIES ROUGH DRAFT OF FULL PROPOSAL OCTOBER-NOVEMBER 2021 FINALIZE PROPOSAL

More Related Content