Iran-Armenia 400kV Power Transmission Line & Noravan Substation Project

Iran-Armenia 400kV Power Transmission Line & Noravan Substation Project
Slide Note
Embed
Share

This project involves the construction of a 400kV power transmission line connecting Iran and Armenia, along with the establishment of the Noravan Substation with capacity levels of 400/220/20kV. The initiative aims to enhance the electricity infrastructure between the two countries, enabling efficient power transfer and contributing to regional energy security and cooperation.

  • Energy
  • Transmission Line
  • Substation
  • Infrastructure
  • Collaboration

Uploaded on Feb 21, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Construction of Iran-Armenia 400kV Power Transmission Line and Related Substation (400/220/20kV Noravan ) Project

  2. Project Main Data Loan amount 107.9 mln euro Financing organization Export Development Bank of Iran (85%) and SUNIR International FZE Company (15%) Loan amortization 2024-2028 Contractor Iran Power and water Equipment & Services Export Company Sunir . http://www.hven.am/

  3. Project Objective Increase electric energy flows between Armenia and Iran from 350 MW to 1,200 MW. Increase the reliability and stability of the parallel operation of the energy systems of Armenia and Iran. Increase the safety level of the RA energy system by strengthening the North-South energy connection of the country. To fully use the capacity of Iran-Armenia gas pipeline within the framework of the " "Gas in exchange for electricity" project. http://www.hven.am/

  4. Project overview The length of the double-circuit overhead transmission line is about 268 km , the number of towers is 711. The substation is located about 200 km from Yerevan, in the settlement of Vaghatin, Syunik Marz, RA. It occupies an area of 12 hectares. The installed capacity in the substation is 2 x 200 MVA.

  5. Expected outcome After completion of the Project Will be increased electric energy flows between Armenia and Iran from 350 MW to 1,200 MW. Increase the reliability and stability of the parallel operation of the energy systems of Armenia and Iran. Increase the safety level of the RA energy system by strengthening the North-South energy connection of the country. To fully use the capacity of Iran-Armenia gas pipeline within the framework of the " "Gas in exchange for electricity" project. The works are foreseen to be completed by the end of 2023.