Item 10a Otay River Estuary Restoration Project
This project focuses on the restoration of the Otay River Estuary, serving as mitigation for the Poseidon Carlsbad Desalination Plant. The timeline includes approvals from the California Coastal Commission, site evaluations, and the Marine Life Mitigation Plan. Current conditions address sea-level rise impacts.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Item 10a Otay River Estuary Restoration Project Mitigation for the Poseidon Carlsbad Desalination Plant CALIFORNIA COASTAL COMMISSION ENERGY, OCEAN RESOURCESAND FEDERAL CONSISTENCY SLIDE 1
Project timeline Commission approves CDP E- 06-013 for the Carlsbad Desalination Plant Mitigation CDP Application submitted Mitigation Site Evaluation Draft EIS issued 2008 2018 2016 2009 2011 2013 2014 2019 2007 Commission approves Marine Life Mitigation Plan (MLMP) Site Characterization and Technical Studies ROD for final EIS published CALIFORNIA COASTAL COMMISSION ENERGY, OCEAN RESOURCESAND FEDERAL CONSISTENCY SLIDE 2
Otay River Estuary Restoration Project CALIFORNIA COASTAL COMMISSION ENERGY, OCEAN RESOURCESAND FEDERAL CONSISTENCY SLIDE 3
Current Conditions 24 inches of SLR CALIFORNIA COASTAL COMMISSION ENERGY, OCEAN RESOURCESAND FEDERAL CONSISTENCY SLIDE 4
Current Conditions 24 inches of SLR CALIFORNIA COASTAL COMMISSION ENERGY, OCEAN RESOURCESAND FEDERAL CONSISTENCY SLIDE 5