Kentucky Transportation Cabinet Updates and Strategic Highway Investment Formula
Discover the latest updates from the Kentucky Transportation Cabinet in December 2018, including insights on the SHIFT program, safety focus, project sponsorships, and more. Dive into the detailed information on SHIFT Results, the SHIFT process, 2020 sponsorship allotments, and the components of the strategic highway investment formula for tomorrow.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
UPDATE Kentucky Transportation Cabinet December, 2018
S Strategic H Highway I Investment F Formula for T Tomorrow
SHIFT is SHIFT is Data driven and objective A comparative guide Incorporates local input Similar to successful approaches of other states Transparent and defensible
SHIFT Results SHIFT Results 2018 Highway Plan 2018 Highway Plan 495 Safety and Mobility Projects 85 Relate to Ferry Operations and Various Funding 303 Originate from SHIFT State Funds Less Over-programmed 2016 $3 B 2018 $200 M Biennium Total Plan 2016 $7 B 2018 $1.8 B Silver Lining Flexibility Improvement over previous Plans
Focus Focus on Safety and Improvements on Safety and Improvements PROJECTS INCLUDED PROJECTS OUTSIDE Safety Improvements Rural and Municipal Aid Road Widening Maintenance Work Reconstruction Federally Dedicated Projects New Routes and (CMAQ, TAP, HSIP, ) Interchanges MPO Dedicated Projects 5
SHIFT Process SHIFT Process Sponsorship of projects for scoring Data Verification Statewide Scoring: Establish statewide priorities Regional Scoring: Local Boost / Regional funding Priorities Draft Recommended Highway Plan
2020 Sponsorship Allotments 2020 Sponsorship Allotments # to # to # to District 1 2 3 4 5 6 7 8 9 10 11 12 Sponsor 50 56 48 52 74 53 68 45 40 35 37 31 ADD Sponsor 40 23 67 16 38 16 18 23 29 22 43 30 23 41 36 MPO Sponsor 10 6 54 10 23 27 9 12 3 BARREN RIVER BIG SANDY BLUEGRASS BUFFALO TRACE CUMBERLAND VALLEY FIVCO GATEWAY GREEN RIVER KENTUCKY RIVER KIPDA LAKE CUMBERLAND LINCOLN TRAIL NORTHERN KENTUCKY PENNYRILE PURCHASE Bowling Green Evansville Louisville KYOVA Lexington OKI Owensboro Radcliff Clarksville 7
Formula Components Formula Components
Two Phase Prioritization Two Phase Prioritization Statewide Mobility (Central Office) District Impact (ADD,MPO,HDO) Focus Address Congestion and Bottlenecks Eligible Projects -Statewide type Projects (Interstates/NHS) Selection100% Data Projects Programmed prior to Area Planning Input Focus Improve Connectivity within Districts Eligible Projects -Projects Not Selected in Statewide Mobility Category -District Projects Selection based on 70% Data & 30% Area Planning Input 9
2020 Funding Formula Statewide Regional * *Standard Regional % listing, Regions may adjust priorities by up or down by 5% with a minimum of 5% in any individual criteria. The overall data portion of the score will remain at 70%. The District and Local Priorities % may not be adjusted.
Improving Formula Components Improving Formula Components
Workgroup Workgroup Advisory Committee Advisory Committee KYTC Kentucky House of Representatives Area Development Districts KY Senate Metropolitan Planning Organizations KY League of Cities KTC (Technical Advisors) KY Association of Counties KY Judge/Executive Association
Component Improvements Incorporating new Highway Safety Manual methods. Safety Updating with field sampled real data as a measure of congestion. Congestion Improving the travel time modeling inputs for TREDIS economic modeling software. Adding truck reliability and coal haul routes. Economic Growth Benefit/ Cost Customizing safety improvement types for KY and improving travel time modeling methods. Asset Incorporating Pavement Distress Index in Pavement Assessments. Management
Schedule Schedule Winter 18-19 Spring 19 Early Late Winter 19-20 Spring 20 Phases and Timing Summer 19 Summer 19 Fall 19 Sponsorship Data Verification Statewide Prioritization Regional Prioritization Recommended Highway Plan Enacted Highway Plan