Ljubljana Status: CCE of 8 Minis Measured, All Above Threshold

Ljubljana Status: CCE of 8 Minis Measured, All Above Threshold
Slide Note
Embed
Share

In the recent ITk strip meetings led by Vladimir Cindro on 11/10/20, the status of Ljubljana shows that all 8 minis measured were from preproduction and yielded results exceeding the set threshold level. Additionally, design changes were discussed for Petal Tapes, focusing on minor adjustments to module positions based on an outdated CAD drawing. The final CAD drawing is expected by the end of February for review and submission in mid-March. Production timelines for Tapes and Elgoline are set, with necessary testing and database entry underway. Meeting details and progress updates are documented in a series of images.

  • Ljubljana Status
  • ITk Meetings
  • Vladimir Cindro
  • Preproduction
  • CAD Drawing

Uploaded on Feb 27, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Ljubljana status CCE of 8 minis measured, all from preproduction all results above the threshold threshold 11/10/20 Vladimir Cindro, ITk strip meeting 1

  2. 11/10/20 Vladimir Cindro, ITk strip meeting 2

  3. Petal Tapes Design changes: minor changes rotate the position of the modules which means rotate the lines along the bustape. This comes from a wrong old petal CAD drawing. Need final petal CAD drawing, including the module (hybrids, powerboard) description. Complete design by end February, review and submit mid- March. Pre-production = 5%, Yield factor=1.256 50 Tapes Production Elgoline 2-3 months (first tapes earlier). Elgoline dostavil 4+4 flekse, se testirajo Vnos v databazo! 3

  4. 11/10/20 Vladimir Cindro, ITk strip meeting 4

  5. 11/10/20 Vladimir Cindro, ITk strip meeting 5

  6. 11/10/20 Vladimir Cindro, ITk strip meeting 6

  7. 11/10/20 Vladimir Cindro, ITk strip meeting 7

  8. 11/10/20 Vladimir Cindro, ITk strip meeting 8

  9. 11/10/20 Vladimir Cindro, ITk strip meeting 9

  10. 11/10/20 Vladimir Cindro, ITk strip meeting 10

Related


More Related Content