Maintenance and Beam Operations Schedule
This schedule outlines maintenance tasks and beam operations for various equipment and systems from Aug 29th to Oct 3rd. Tasks include Linac maintenance, RF system checks, water path maintenance, and more. The schedule provides detailed information on specific tasks to be carried out on specific dates.
Uploaded on Feb 20, 2025 | 0 Views
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Aug 31st Aug 30th Sept 2nd Aug 29th Sept 3nd Sept 1st Sept 4th Monday Wednesday Thursday S Tuesday Friday S RIL Source maint. Linac Plate and frame Heat exchanger install and water recovery RF maint. Power supply maint. RF maint. Booster H20 repairs RF buss bar install 8 GeV line RF maint. RF Water path Heat exchanger cleaning MI/RR R232 aperture improvement MI Q309 replacement MI305 A sump replacment Configure MI LCW back to normal mode from Hose change out P2 vacuum work F-sector/TH SYD + F13 Swic install S220 replacement H20 and Vac maint Recover Remanent LCW system Water leak repair Muon Campus final testing of the module Install target module NuMI reattachment of the Target movement of the coffins to TSB work on the AP0 target. 2 2/20/2025 Presenter | Presentation Title or Meeting Title
Sept 12th Sept 19th Sept 5th Sept 26th Oct 3rd F M S S T F W M S S T W T T F M T S S W F M M T S S T W W T T RIL Source running Beam C D C S S SS test Linac Studies. Linac running Beam Foil Rep C D C Booster Vac leak check L3,2 and 400mev Key Core S S int test S S Booster running Beam RF maint. H20 repairs C D C Key Core SS test S S 8 GeV line BNB Running Beam FDR9 5/97 PP MI Q309 replacement Secure 8/10/2 0-62 MI62 MI/RR MI/RR Running Beam Turn on LCW C D C MI20 sump line relocate int test S S Key Core SS test RF Water path FDR 94/ 95 PP Tran sfer Gall M03 &4 M01 &2 SSB/ G2 NWA /NS4 F-sector/TH SYD + FCC Spin MT4Q6 replacement SS F sector/TH Key Core SS test Muon Campus SS SS test Pre T & V Pre T&V HV101 repairs NuMI Sump Maintenance C D C Running Beam S S Key Core SS test Munter Maintenance Power Supply tests Target scan Hepa Filter replament MSS Re-energized- back feeder from KRS (Power off to main Site, except MI and Village KRS De-energized- back feeder from KRS (Power off to MI and SBND 7-8 8-9 Sept 7th transition to Postgres 8-9 KRS Re-energized- back feeder from KRS (Power off to MI and SBND 2/20/2025 Presenter | Presentation Title or Meeting Title 3