March 25, 2015 - Heavy Construction Association Infrastructure Investments

heavy construction association n.w
1 / 9
Embed
Share

Discover the extensive infrastructure investments made by the Heavy Construction Association on March 25, 2015, totaling millions of dollars for projects such as LED streetlight replacements, multi-use trails, watermain replacements, and more. Gain insights into the various upgrades and construction works undertaken to enhance public amenities and utilities in the community.

  • Construction
  • Infrastructure
  • Investments
  • Projects
  • Association

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods, P. Eng., Manager of Environmental Services Allan Botham, P. Eng., Manager of Engineering Services

  2. - Investing $12.9 million in Infrastructure Replacement of streetlights with LED. $1.3 million Phase 1 of a multi-use trail along CR 20 in cooperation with CWATS Resurfacing and construction of a multi-use trail along Mersea Road 3. $1.2 million $1.8 million in watermain replacement $1.4 million in our PCC $750k in Drainage Capital Works

  3. TOTAL $1,400,000 HIGHLIGHTS Install 4th Screw Pump Install inspection manholes on sewer outfall Biosolids Upgrades $ 540,000 $ 200,000 $ 400,000

  4. TOTAL $1,800,000 HIGHLIGHTS Hazelton, Queens and Windsor Ave White Street Foundry, Clark, Ivan, Whitney Melrose $530,000 $130,000 $600,000 $375,000

  5. TOTAL $5,500,000 HIGHLIGHTS Mersea Road 3 (Rehab and Trail) Erie - Oak to Askew Recon CR 20 CWATS Trail Bridge No. 8 on Mersea Road 11 (OCIF) LED Street Light Conversion Sidewalks Traffic Signal Work Various Road Resurfacing $ 1,200,000 $ 1,300,000 $ 530,000 $ 400,000 $ 1,300,000 $ 150,000 $ 80,000 $ 500,000

  6. TOTAL $1,400,000 HIGHLIGHTS Wilousa Seneca Sewer Upgrade Erie South Storm Outfall Pelee Drive Sanitary (Engineering) NE Trunk Sewer EA and Prelim Design $ 180,000 $ 175,000 $ 335,000 $ 200,000

  7. TOTAL $ 750,000 HIGHLIGHTS Engineer s Reports Development New Drains Updated Engineer s Reports Other $ 180,000 $ 160,000 $ 370,000 $ 40,000

  8. Misc. 2015 New Soccer Field House Facility Leamington Transit Shelters Pads Benches $ 600,000 $ 70,000 Future Years NE Trunk Sewer - Seacliff to Road 6 (2016-17) $ 10,000,000 Pelee Drive Sanitary Sewer (2017-19) $ 10,000,000