Meetings and Tests for Cryostat System Follow-up

future meetings and reporting n.w
1 / 4
Embed
Share

Stay on track with progress reports and follow-up meetings for the vertical cryostat system. Ensure proper testing and controls are in place for optimal operation. Weekly reports sent to FREIA, with detailed testing protocols and compliance measures outlined for the team.

  • Meetings
  • Cryostat
  • Testing
  • Follow-up
  • Control System

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Future Meetings and Reporting Follow-up Meeting UH2015/06 (vertical cryostat, Gersemi) Roc o Santiago Kern 1 21st June 2016

  2. Meetings Progress reports A brief report of the activities carried out must be sent to FREIA every week Follow up meetings Kick-off meeting: 10th May at FREIA 1st follow up meeting: 21st June at Cryo Diffusion s premises Following meeting: after review of drawings (August) Combined with some meetings: longer stays for FREIA personnel to get to know the system while is being built 21st June 2016 2

  3. REMINDER 3 21st June 2016

  4. Tests Dimensional controls Complete cryostat and control system Safely work in all modes of operation Switch between modes of operation Proper reaction to interlock signals Produce interlocks to the cryogenic system Helium leak tests after three thermal shocks Vacuum performance of VB and VCS Pressure tests for the cold vessel Correct assembly of all parts and the VCS with the different inserts All tests must be followed by documentation Prior to testing: protocol for testing After testing - Results - Compliance to specifications - If deviations observed, the nature of the deviations and the proposed solutions Correct lifting of all equipment VB VCS with each insert Control system: functional tests of all valves, instrumentation, etc 4 21st June 2016