NASA EVM Capability Development Updates August 2010

ndia pmsc quarterly meeting august 26 2010 n.w
1 / 6
Embed
Share

Stay updated with NASA's EVM capability development progress including policy and requirements updates, findings from independent peer reviews, and the initiation of pilot projects testing proposed EVM processes and products.

  • NASA
  • EVM
  • Capability Development
  • Policy
  • Requirements

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. NDIA PMSC Quarterly Meeting August 26, 2010 NASA Update Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team) 256-544-2419

  2. Topics 1. Policy and Requirements Update 2. NASA EVM Capability Development Status 3. EVM Capability Development Summary Schedule 1

  3. Policy and Requirements Update 1. NASA s Program/Project Management Requirements for Flight Projects, NPR 7120.5 version E is still on track for a 4th Qtr CY2010 completion Provides additional guidance and clarity to Project Planning & Control requirements Applicability of ANSI/EIA-748 guidelines vs. EVM principles for NASA in-house projects with a life cycle cost of estimate of greater than $20M IBR requirements for NASA in-house project implementations Ensure consistency between new Management Agreement definition and PBB (Includes PMB & Reserves) Initiate EVM planning during project Formulation (phases A & B) with formal application and reporting starting in project Implementation (phase C) Acknowledges and requires adequate cost and schedule margin to be incorporated into the project integrated baseline 2. Completed Revision 4 of our draft Agency EVM System Description document (end of July). Further updates to come based on findings & results of our continued EVM project pilot testing 2

  4. NASA EVM Capability Development Status Findings and comments from an Independent Peer Review of our Draft NASA EVM System Description & other associated documents have been assessed and adjudicated. Updates to the EVM System Description resulting from Peer Review have been incorporated and a new draft revision was completed. Updates to associated documents (handbooks and training) are scheduled. First EVM project pilot was brought to a premature completion due to the impacts and changes resulting from the cancellation of the Constellation Program. (Extra Vehicular Activity (EVA) Project at JSC). Insights and benefits were gained even though the pilot testing was shortened: Typical implementation gaps were identified and better understood Over 50 Lessons Learned were documented for use in helping to better define our Agency EVM documentation, guidance, and methods Gained insights into potential process work-arounds for problem areas 3

  5. NASA EVM Capability Development Status Started the second of two EVM pilot projects this month in which we will further test and validate our proposed Agency EVM processes and products. (Ice, Cloud, and land Elevation Satellite II (ICESatII) Project at GSFC). (The ICESatII project is currently in Phase A Formulation with no preliminary baseline established yet. This project contains a significant amount of in-house development along with prime contracted effort allowing us to also test how we best merge all EVM data for a total project picture.) Update EVM process training material for pilot project use and later Agency-wide use (October 2010) Draft update of the NASA EVM Implementation Handbook (September 2010) Draft update of the NASA CAM Handbook for EVM (September 2010) 4

  6. EVM Capability Development Summary Schedule 10/21 5