Network Simulation Techniques for Internet Delay Analysis in Computer Engineering Department
Explore the concepts of internet delay analysis in the Computer Techniques Engineering Department at Al-Mustaqbal University. Learn about nodal delay components, TTL, RTT, RTD, USB, Bluetooth, and more in this comprehensive lecture series by Dr. Muamer N. Mohammed.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Computer Techniques Engineering Department College of Engineering and Technology Al-Mustaqbal University Network Simulation Course BY Dr. Muamer N. Mohammed 1
Lecture4 Internet Delay 2
Nodal delay dnodal= dproc+dqueue+dtrans+dprop dproc = processingdelay dependes on time checking error, packet forwarding algorithem. dqueue = queuingdelay depends on congestion and packet on thelink. dtrans = transmissiondelay = L/R, significant for low-speedlinks dprop = propagationdelay The propagation speed depends on the physical medium of the link (that is, fibre optics, twisted-pair copper wire, and so on = d/s 6
TTL1,TTL2,TTL3 RTT,RTD (ROUND TRIP TIME,DELAY) 7
d d Host layers d se NetBios Pa Media Fr layers bit 15