NSTX-U Collaboration Research Plans and Diagnostics Overview

nstx u n.w
1 / 6
Embed
Share

Explore the research plans and needs for NSTX-U supported by the collaboration of various institutions and universities. The focus is on preparing for NSTX-U operations with projects like MSE off-line timing measurements, MSE-LIF installation, and ongoing research goals for the future. Dive into the details of diagnostics support, high-priority research goals, and the impact on different TSGs within the 5-year plan.

  • Research
  • Collaboration
  • NSTX-U
  • Diagnostics
  • Universities

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. NSTX-U Supported by NSTX-U Collaboration Status and Plans for: Nova Photonics, Inc. Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC Culham Sci Ctr Fred M. Levinton, Howard Yuh York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NSTX-U Collaborator Research Plan Meetings PPPL LSB B318 April / May 2014 NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, J lich IPP, Garching ASCR, Czech Rep

  2. Research plans and needs for this year (FY2014) in preparation for NSTX-U operations in FY2015 rtMSE Off-line timing and latency measurements will be completed this year. Analysis software completes in a few milliseconds. Install new computer hardware in mezzanine and integrate into existing MSE-CIF system. Integrate rtMSE into NSTX-U control system (FY2015). Duplication of data will be retained for the first year or two. XP-> Windows 7 migration Requires upgrade of LabView to v8.6 and new interface cards. We can continue to use existing National Instruments DAQ modules and chassis so long as we don t upgrade LabView to a version higher than v8.6. PCI facility clock card? NSTX-U 2 NSTX-U Collaboration Status and Plans - April / May 2014

  3. Research plans and needs for this year (FY2014) in preparation for NSTX-U operations in FY2015 MSE-LIF installation. Re-installation of existing (10 sightlines) and new fibers (14 sightlines) in process now. Installation of optics table for collection optics and fiber array holder is complete. Laser testing complete and ready for installation. All detectors and interference filter have been received. Assembly of detector system to be completed this year. Data acquisition system to be procured later this year. Test cell access will be needed for spatial calibration (near term) and DNB/laser system testing (end of FY2014). NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014

  4. Research Plans for FY2015 beyond MSE diagnostics support research in all NSTX-U TSGs. MSE-CIF, rtMSE, and MSE-LIF will support several of the highest priority research goals highlighted in the 5 year plan, spanning several TSGs including: 100% NI sustainment (ASC). Transport at reduced * and high-beta under varying q-profiles (T&T). Understanding of non-inductive start-up and ramp-up (Start- up/Ramp-up). MSE will diagnose the current drive/q-profile evolution from new off- axis beams (Crosscutting). NSTX-U 4 NSTX-U Collaboration Status and Plans - April / May 2014

  5. Research Plans for FY2015 beyond Fast ion modes, anomalous beam diffusion/loss effects on current profile at higher fields and from new beams (Fast ions). RF current drive/sustainment efforts during ramp-up and low current H-modes at increased Bt (RF). MSE-LIF will provide a non-perturbative current profile measurement for RF experiments. The combined, fully-cross calibrated MSE systems will allow for Er measurements and better edge current density measurements, increasingly important to understand pedestal stability and transport (Boundary). rtMSE could possibly support feedback information useful for macro stability (Macro). Explore new MSE-LIF capability to measure P(R). NSTX-U 5 NSTX-U Collaboration Status and Plans - April / May 2014

  6. Highest-priority incremental measurement capability (For diagnostic solicitation grantees funded for 2012-2015) Fast Filter Switching for MSE-CIF to view different beam sources in real-time. Presently done manually, between shots. Electronic switching can be done in several milliseconds. NSTX-U 6 NSTX-U Collaboration Status and Plans - April / May 2014