National Electrification Plan in Myanmar aims to fully electrify all regions by 2030 through sustainable energy initiatives and coordination with international partners. The plan focuses on securing funding, adopting cost-effective approaches, and ensuring universal access to electricity. Various methods such as national grid connection, mini-grid setups, and renewable energy sources are employed to achieve the electrification targets. Detailed population estimates and transmission line expansion plans are outlined to facilitate efficient electrification efforts.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Objectives, Scope and Procurement Plan of NEP By Thuya Aung Bo Deputy Chief Engineer Project Management Office (NEP) Ministry of Electric Power Manufacturer s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October 27.2015 1
National Electrification Plan (NEP) Objective : To fully electrify all regions of Myanmar by 2030 Plan arrangement : UN's Sustainable Energy for ALL (SE4ALL) : To fully electrify all regions of Myanmar by 2030 Leading body of drafting : World Bank Group Period of drafting : May 2013 to September 2014
Objectives of National Electrification Plan (NEP) Manage to achieve the required sufficient fund for the plan to ensure access to electricity in the whole country. The committee, serving as single window , to coordinate with international development partners; local and international private sectors, including state s budget, for the investment fund of the plan. Manage to adopt the least-cost approach in undertaking the project activities under National electrification plan. Manage and supervise the implementation of the project to be considered beneficial to the people. To set up clear directions and framework for private investors participation. In an effort to provide electricity in off-grid areas, to handle with setting the rate of power tariffs based on the amount of reasonable expenditure and returns.
Power availability under National Electrification Plan (NEP) Numbers of household that will be able to access to the electricity : 7.2 . Methods (1) Connect with National Grid (2) Connect with Mini Grid (3) Powered by solar, mini hydro, wind, diesel and hybrid (diesel + solar etc.) as pre-electrification. Electrify by National Grid 99% of the households that is 50 km range from National Grid under this plan Mini Grid ,Solar Home System and others 1 % is from mini grid, solar and others. Planned to electrify 100% of the country by 2030
To be Electrified from National Grid Transmission Lines Existing and Future Transmission Expension Plan Estimated Population (2011) State/Region within 25 km within 50 km Kachin 1,257,257 92% 96% Chin 5,985,389 92% 96% Kayar 262,623 100% 100% Kayin 1,588,067 84% 94% Mon 2,675,187 97% 100% Tanintharyi 1,220,319 95% 100% Yangon 6,614,051 97% 100% Ayeyarwaddy 5,525,272 84% 98% Bago 5,962,202 96% 100% Rakhine 4,296,507 90% 99% Chin 513,818 55% 89% HV Transmission Line (Existing) Sagaing 5,827,408 87% 98% HV Transmission Line (Planned) Magway 5,196,998 88% 100% Mandalay 6,744,796 97% 100% Electrification Area within 25 km NayPyiTaw 648,236 100% 100% Electrification Area within 50 km Total 54,318,130 92% 99% 5
Yearly Expansion of Electricity form 2015-2016 to 2029-2030 Fiscal Year 100% To fully electrified the whole country total 517,000 household should be yearly connected after 2020 76% 47% 31% September 6
Priority Stage for Electrification from the Power system Grid First Priority - Populated Area which will very close to the Power system Grid Second Priority - Moderate Populated Area which can be connected from the Power System Grid Last Priority - Remote Area which will be very difficult for transportation 7
Priority Stage for Electrification from the Power system Grid First Priority - Populated Area which will very close to the Power system Grid Second Priority - Moderate Populated Area which can be connected from the Power System Grid Last Priority - Remote Area which will be very difficult for transportation 8
Proposal for Usage of World Bank Loan USD 310 million Total Cost (million USD) Sr Description 1 Material Cost for 11 kV Line and Distribution Transformer (First Phase-Priority) 164.2 2 66 and 33 kV substation Upgrading (Second Phase) 53.5 3 Third Phase 60.6 4 Contingency for above 21.7 5 TA and Project Management 10 Total for above 310 Loan amount 310 9
Draft Procurement Plan for 11 kV network materials Expected Contract dated Procurement Methods Sr Type of Materials Comment Lot 1 Transformer ICB 10 Lot Mar-2016 2 Concrete Pole ICB 13 Lot Apr-2016 3 ACSR Conductor ICB 11 Lot May-2016 4 11 kV Insulator ICB 7 Lot May-2016 5 LA,D/S,Fuse and Accessories ICB 3 Lot May-2016 6 Office Equipment Shopping 2 package Jan-2016 7 Vehicles NCB 1 Jan-2016 ICB International Competitive Bidding NCB National Competitive Bidding 10
Transformer Package LOT Quantity Delivery Site 1 Bago West-District, PMO Office 915 Kachin,Chin,Sagaing District, PMO Office 2 1038 3 Shan(N) -District, PMO Office 221 Kayar, Shan(E),Shan(S) District, PMO Office 4 351 Magway,Rakhine District, PMO Office 5 784 Bago(E),NayPyiTaw District, PMO Office 6 741 Kayin,Mon,Tanintharyi District, PMO Office 7 150 8 Ayeyarwaddy-District, PMO Office 839 9 Yangon 236 10 Mandalay 396 Total 5,671
Defining contract package to Bid the Concrete Pole Lot No No. of Materials Delivery Site 1 311 Kachin -District, PMO Office 2 2950 Kayin-District, PMO Office 3 2963 Mon,Tanintharyi-District, PMO Office 15666Kayar, Shan(E),Shan(S) District, PMO Office 4 5 47263 Chin,Sagaing-District, PMO Office 6 6962 Shan(N)-District, PMO Office 7 33276 Magway,Rakhine-District, PMO Office 8 30154 Bago(E)-District, PMO Office 9 34725 Bago(W)-District, PMO Office 10 41131 Ayeyarwaddy-District, PMO Office 1 3379 NayPyiTaw- ESE Store 12 12286 Yangon 13 20769 Mandalay Total 251,834
Defining contract Package to Bid the ACSR Conductor Lot No Tons Delivery Site 348Kayar,Shan(E),Shan(S) -District, PMO Office 1 1058Kachin,Chin,Sagaing -District, PMO Office 2. 3. 152 Shan(N)-District, PMO Office 4. 737 Magway,Rakhine-District, PMO Office 5. 670 Bago(E)-District, PMO Office 6. 765 Bago(W)-District, PMO Office 7. 917 Ayeyarwaddy-District, PMO Office 131Kayin,Mon,Tanintharyi -District, PMO Office 8. 9. 75 NayPyiTaw- ESE Store 10. 275 Yangon 11. 465 Mandalay Total 5593
Defining Contract Package to Bid the 11 kV Insulator Lot No Delivery Site Kachin,Chin,Sagaing, -District, PMO Office 1. Magway,Rakhine -District, PMO Office 2. Bago(W),Ayeyarwaddy -District, PMO Office 3. Kayar,Kayin,Mon,Shan(E),Shan(N), Shan(S)-,Bago(E),Tantharyi District, PMO Office 4. 5. NayPyiTaw- ESE Store 6. Yangon 7. Mandalay Total 7 Lots
Defining Contract Package to Bid the LA,D/S, Fuse and Accessories No. of Lot Delivery Site NayPyiTaw- ESE Store 1 Yangon 1 Mandalay 1 Totals 3 Lots