Opportunities in OHB System AG Procurement Organization in Latvia

esa 6th rpa call in latvia some hints from n.w
1 / 15
Embed
Share

Learn about OHB System AG's activities as a Large System Integrator, system design processes, procurement elements, and the opportunities available in upcoming missions. Contact the Procurement Central Office for more information on RFIs, RFPs, NDAs, and project procurement managers. Explore the various subsystems and elements procured for spacecraft projects.

  • OHB System AG
  • Procurement Organization
  • Opportunities
  • Spacecraft
  • Subsystems

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. ESA 6TH RPA CALL IN LATVIA SOME HINTS FROM OHB SYSTEM OHB PROCUREMENT ORGANISATION AND OPPORTUNITIES IN UPCOMING MISSIONS L. SPANI MOLELLA, 20.05.2025 PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 1 BASED ON: TM-2234-OHB_01

  2. OHB SYSTEM AG ACTIVITIES AND PROCUREMENT ELEMENTS OHB System AG activities as European Large System Integrator (LSI) System Design of complex and advanced spacecrafts (satellites, probes, space station elements ) in all technical disciplines Identification of system parameters and specifications Procurement of best subsystems, equipment and services Integration and verification of subsystems and full satellite (AIT) Spacecraft = summary of subsystems and elements (i.e. system of systems) Structure and mechanism elements Energy generation and distribution Avionics and Data Handling Communication and Telecommand AOCS and Propulsion Thermal management Payload Each subsystem includes different equipment, to be procured from various suppliers and partner companies Associated services are procured by OHB System AG to complete the satellite as a product (Subsystem Design/Engineering, Test Facilities ) PLATO satellite PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 2

  3. OHB SYSTEM AG PROCUREMENT ORGANISATION Procurement Central Office (RFIs, RFPs, NDAs) Andrea Marchese & team (pco@ohb.de) Project Procurement Managers (Procurement heads in various projecst) Daniel Bindel (PLATO / LISA) Leila Saleh (EnVision) Massimiliano Olivier (CO2M) Nicola Travaglione (Esprit, MTG, Argonaut LDE) Ren Reijnst (Harmony) Anja Koutsoutos (LEO PNT / Galileo / Hive) Francesco Barba (Odin s Eye) Andre Burzlaff (Sarah, OptSat) Maik Bootsmann (SatCom BW/Sparrow) Alexandre Pilat (Forum Instrument, Optsat Instrument, EE-11 cand. miss. Cairt, future optical instruments, Sentinel 3-NG- Topo) Chiara Famulari (Chime Instrument) Marie Br ning (act.) (Iris ) Emre zcan (act.) (Ramses) Henning Kempfe (act.) (Clearspace-1/Adrios, In-Space POC-1&2) Luca Spani Molella (Early project phases, i.e.: Argonaut missions MK-1 (ArgoNET) and MK-2; Sentinel-2-NG; Sentinel-3-NG-Opt; Earth Explorer 11 cand. miss. Wivern; Earth Explorers 12 cand. missions (ECO, Keystone, Hydroterra+, Cryorad); L-2 New Athena; L-4 (Saturn moons - Enceladus); M-7 cand. Missions (Theseus, Plasma Observatory & M-Matisse); Inspirator/CLCV; Neomir; Oasis; MeDAL; TerraSAR Fox) Procurement Procurement Electronics & AOCS Procurement MTP & Services RF Payloads, Communication & Ground Segment Team Lead Henning Kempfe Team Lead Dr. Marie Br ning Team Lead Kathrin Gribenow Category Managers Michael Digoin (Power) Henning Kempfe (Data Handling) Robert Baleanu (AOCS) Deniz Ulu (Communication) Michela Cantisani (Propulsion) Emre zcan (Mechanical/Thermal) Subcontract Managers PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 3

  4. OHB SYSTEM AG (& OHB DIGITAL) MAIN PROCUREMENT ELEMENTS OHB Digital OHB System AG Platforms RF Payloads Ground Segment Power Structure Communication Signal Gen. Ground Antennas Bremen Data Handling Thermal Data Handling Services Data Handling AOCS Propulsion GSE Optical Payloads Optics Structure Mechanisms Oberpfaffenhofen Thermal Opto-Electronics GSE PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 4

  5. OHB SYSTEM AG PARTICIPATION POSSIBILITIES IN UPCOMING ESA MISSIONS (SCIENCE, EXPLORATION, SSA, & EO DIRECTORATES) Upcoming Implementation Phases Procurement scheme (exp.) Expected RFP/ITT period MISSION Opportunities Best Practice (ITTs in esastar) Minor MGSE (PF rebuild targeted) Running Ramses (refer also to OHB-I) M7 Candidate M-Matisse (ph. A) Partial Consortium Platform items (Mars) Interesting for RPA From 2028 on M7 Candidate Plasma O. (ph. A) Partial Consortium Small plaform items ( newspace ) Interesting for RPA From 2028 on Partial Consortium M7 Candidate Plasma O. (ph. A) Power and Comm items Interesting for RPA From 2028 on PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 5

  6. OHB SYSTEM AG - PROCUREMENT PARTICIPATION POSSIBILITIES IN UPCOMING ESA MISSIONS (SCIENCE, EXPLORATION, SSA, & EO DIRECTORATES) Upcoming Implementation Phases Procurement scheme (exp.) Expected RFP/ITT period MISSION Opportunities Best Practice (ITTs in esastar) Argonaut/EL3 (LDE) EPS, COMMs AOCS/GNC items ITTs from Q2 2025 Sentinel 3 NG - Topograhic RFPs by OHB from Q2 2025 on Full Consortium Platform items 2025 2026 (P/L) 2027 (PF) Platform and payload items Sentinel 2 - NG Full Consortium Sentinel 3 NG - Optical Platform and payload items Full Consortium RFPs from 2027 PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 6

  7. OHB SYSTEM AG - PROCUREMENT PARTICIPATION POSSIBILITIES IN UPCOMING ESA MISSIONS (SCIENCE, EXPLORATION, SSA, & EO DIRECTORATES) Upcoming Implementation Phases Procurement scheme (exp.) Expected RFP/ITT period MISSION Opportunities Full Consortium expected Optical payload items RFPs from late 2026 EE-11 Cairt Full Consortium expected RFPs from late 2026 EE-11 Wivern Platform items Argonaut mission MK1 (ph. A/B1) Enhanced subco. participation PF items (STR, DHS, SW areas) Interesting for RPA ITTs from Q3 25 Argonaut mission MK1 (ph. B2CD) PF items RFPs from 2027 (approval pend.) Interesting for RPA Full Consortium (thermal! power!) PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 7

  8. OHB SYSTEM AG - PROCUREMENT PARTICIPATION POSSIBILITIES IN UPCOMING ESA MISSIONS (SCIENCE, EXPLORATION, SSA, & EO DIRECTORATES) Upcoming Implementation Phases Procurement scheme (exp.) Expected RFP/ITT period MISSION Opportunities Special needs for moon Phase A/B1 to start Interesting for RPA ? OASIS (ph. A/B1) Impl. phase in the 30 s Special needs for far planets Interesting for RPA L4 (ph 0) ? Phase A/B1 to start Items for Mars rover Interesting for RPA MEDaL (ph. A/B1) ? ? CLTV / Inspirator Platform items ? PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 8

  9. OHB SYSTEM AG - PROCUREMENT PARTICIPATION POSSIBILITIES IN UPCOMING ESA MISSIONS (SCIENCE, EXPLORATION, SSA, & EO DIRECTORATES) Upcoming Implementation Phases Procurement scheme (exp.) Expected RFP/ITT period MISSION Opportunities ITT for B2CD expected 2025 ? InS-PoC 1 Platform Interesting for RPA InS-PoC 2 ? ? Platform S6-NG Full Consortium ? Platform NeoMir (Phase A2) Platform and cryo optical payload Interesting for RPA ? 2029 PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 9

  10. OHB SYSTEM AG - PROCUREMENT PARTICIPATION POSSIBILITIES IN UPCOMING ESA MISSIONS (NAVIGATION & COMMUNICATION DIRECTORATES) Upcoming Implementation Phases Procurement scheme (exp.) Expected RFP/ITT period MISSION Opportunities bidding phase for 2nd batch ongoing Consortial offer LEO-PNT Few residual GSE Full Consortium expected RFI from OHB being sent now MEO satellite elements IRIS Optical time transfer & ranging Interesting for RPA OptStar (Ph 0) ? ? Very low earth orbit platform Interesting for RPA ? VLEO ? PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 10

  11. OHB SYSTEM AG - PROCUREMENT GOOD PRACTICES Examplary success story of a company included in the OHB supply chain as a subcontractor for flight equipment Company background: SME from geographically under-returned country (already ESA member state at that time) originally supplying the same equipment for the military area (mainly American customers) but with different characteristics some free capacity due to some lost contracts in recent past First contacts: years 2015-2016 : Co-financed RFI in science mission for specific item: one of three pre-screened supplier from under-returned countries Convincing feedback to OHB in 1stRFI response. Several follow-up iterations with OHB (technical & programmatics) 2-days company Audit with participation of ESA (PA) and OHB (PA, Procurement, Engineering) after Audit they thought they would be out Implementation of Audit outcomes and willingness to learn necessary know-how (e.g. ECOS) commitment to potential internal investments before contract signature (e.g. clean room) PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 11

  12. OHB SYSTEM AG - PROCUREMENT GOOD PRACTICES (I.E. EXEMPLARY STORY ON HOW TO BE INCLUDED IN THE OHB SUPPLY CHAIN) Company follow-up steps to inclusion in supply chain: 2017: wins first contract with OHB in same mission for which they were audited and originally contacted through RFI campaign (pre-selected after competitive RFP for technical and programmatic reasons) Build-to-print contract (no engineering) Activation of committed investments (clean room) Company showed overall good performance and timely deliveries despite some delayed inputs from OHB! 2019: wins also second contract with OHB in second competitive ITT Build-to-spec (i.e. incl. engineering and participation into engineering models design) Company showed positive learning curve on engineering! 2022 wins further contract with OHB Italia for same item on another mission (again, through pre-selection after competitive RFP and tough negotiation) Recently selected for contracts with other primes for same item Now well positioned for future mission showing a good balance between commercial competitiveness, programmatic commitment and good technical skills; managed to maintain the working force and to make necessary investments to improve company competitiveness with the budged made available through the won projects PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 12

  13. OHB SYSTEM AG - PROCUREMENT GOOD PRACTICES (I.E. EXEMPLARY STORY ON HOW TO BE INCLUDED IN THE OHB SUPPLY CHAIN) What went well? They convinced OHB and ESA and were considered credible despite the risks of taking them on board They showed their gratefulness for having been selected with good quality work and timely delivery They profited from the boundary conditions (e.g. programmatic, geo-return) being the right supplier at the right moment in time They were keen on growing and learning They kept a communicating with the prime also outside the project specific environment They tried to understand the needs of the prime contractor and work with the prime instead of against it Through the above process the company grew from < 40 people to approx. 100 people (as of today) Will you be the next good case? P.S.: none of the below described steps is mandatory; the story shows only one potential good example! PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 13

  14. OHB SYSTEM AG - PROCUREMENT GOOD PRACTICES (FOR ESA ITTS AND CALLS) Do your work before the ITT comes out!! Prepareeverything you can prepare in advance Start early enough (i.e. now) Prime contractors are not so flexible (e.g. bid-no-bid processes): it takes a while for them to react Prime contractors are busy; they do a lot of other things in parallel; you need to present something which is appealing to them Focus on one activity for the time being. Time is short and you need to push one first to make your name Keep in mind: 6 weeks run very quickly! and in your case, they are in the middle of the holiday period!! Be resilient: there will be another call Good Luck! PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 14

  15. THANK YOU! OHB SE Manfred-Fuchs-Platz 2-4 28359 Bremen Germany Dr. Luca Spani Molella Phone: Fax: E-mail: Web: +49 421 2020 9378 +49 421 2020 700 luca.spanimolella@ohb.de www.ohb.de PROCUREMENT ORGANIZATION & OPPORTUNITIES // L. SPANI MOLELLA // 20.05.2025 // PUBLIC 15

Related


More Related Content