OREDA's Renewable Energy Programs in Odisha

odisha renewable energy development agency oreda n.w
1 / 15
Embed
Share

"Odisha Renewable Energy Development Agency (OREDA) has been actively promoting research, development, and popularization of non-conventional and renewable energy sources. Their mission includes providing minimum illumination to remote villages, increasing renewable energy share, and utilizing renewable energy technology in various sectors. Major programs include solar water pumping, rooftop solar plants, village electrification, and more. Explore OREDA's initiatives for sustainable energy development in Odisha."

  • OREDA
  • Renewable Energy
  • Odisha
  • Solar Power
  • Sustainable

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984

  2. Mission Promote Research, Development and Popularization of Non-Conventional and Renewable Sources of Energy VISION VISION Provision of minimum illumination to all Remote Un- electrified Villages/hamlets by 2015 Increase the share of Renewable Energy to 10% of the total power mix by 2020 Accelerated use of Renewable Energy Technology in all sectors of economy

  3. Major Programs being Implemented by OREDA 1. Solar Water Pumping Program for piped drinking water supply 2. Solar water pumping program for Irrigation 3. Rooftop and off-grid solar power plants 4. Distribution of solar lanterns 5. RE Power Projects 6. Implementation of RPO and REC mechanism 7. Village Electrification 8. Unnat Chulla Abhiyan 9. National Program of Biogas and Manure Management 10. IEC and Outreach

  4. 1. Solar Water Pumping Program for piped drinking water supply Phase I ( RWSS) Phase II ( RWSS) Phase III ( RWSS+ MNRE) For 18 IAP Districts only Target : 1762 For 18 IAP Districts only Target : 1762 For all Districts Target : 2000 No. installed : 1762 No. installed : 1682 No. installed : 312

  5. Solar PV Pumping Program for Irrigation Project is on the verge of starting Target for 2014-15: 3000 Steering Committee and finance committee have cleared the project Cost of each project Rs 5.50 lakh To be finalised through tenders Financial arrangement Target : 2610 MNRE Share (CFA) RS 1.21 lakh First advance available State share through S&T budget Rs 1.99 lakh First Advance available OLIC share Rs 2.00 lakh Awaited Farmer s share Rs 0.30 lakh To be collected

  6. Rooftop and off-grid Solar Power Plants The program is mainly implemented for Government buildings, residential schools, hostels, Sevashrams, Health centres, police stations, forest offices, district offices, blocks , Panchayats etc. Total installed capacity till 14-15: 5.114 MW Projects Under implementation during 15-16: Hostels under BJRCY: 25 x 10 KW SCST hostels/Schools : 19 x 10 KW Kendu leaf godowns : 17 x 3 KW District Collectorates : 6 X 10 KW EMRS schools : 2 x 5 KW Primary Health Centres : 6x 6 KW Police stations : 39 x 2.5 KW Petrol pumps: 2 x 2 KW Sevasharm schools ( 55 Nos): 297 KW

  7. RE Power Projects Total installed capacity: Solar : 43.0 MW + 5.0 MW under REC Biomass: 20.0 MW + 30.4 MW under REC Projects in pipe line Solar : NIL Biomass: 10 MW New Application received Solar : Nil Biomass : 12 MW

  8. Implementation of RPO and REC mechanism In Odisha the RCPO Regulation 2010 is under implementation as per which the quantum of obligation is as under Minimum quantum of purchase in percentage ( in terms of energy consumption in state in KWH) Renewable Co-generation Total Solar - Non Solar 1.00 2010 -11 3.50 4.50 2011 -12 2012 -13 2013 -14 2014 -15 2015 -16 0.10 0.15 0.20 0.25 0.30 1.20 1.40 1.60 1.80 2.00 3.70 3.95 4.20 4.45 4.70 5.00 5.50 6.00 6.50 7.00 OERC has come up with a draft regulation as per which the quantum of obligation is as under Non Solar sources (%) 6.60 7.20 7.80 8.40 Year-wise target 2015-16 2016-17 2017-18 2018-19 Solar Source (%) 0.40 0.80 1.20 1.60 Total (%) 7.00 8.00 9.00 10.00 2019-20 2.00 9.00 11.00

  9. Implementation of RPO and REC mechanism (Contd) Obligated entities identified in the state : 62 Captive consumers : 50 Open access consumers: 12 Partial compliants: 20 OREDA had filed a petition in OERC against all non compliant obligated entity 20.11.2014 requesting action under Section 142. Hearing of the case has been concluded on 5th May 2015 but Order has been kept reserved.

  10. Projects Accreditated by OREDA Under Energy Certificate (REC) Mechanism Installed capacity (in MW) Name of the R.E. Generator Date of Registration Type of RE Project Sl. No. Status Till Date J.K. Paper Mills 1 5.4 MW 07.09.2012 Biomass Earning and Trading RECs OCL India Limited 2 2.5MW 20.05.2013 Solar PV Earning and Trading RECs J.K. Paper Mills 3 25 MW 05.09.2013 Biomass Earning and Trading RECs Mahanadi Coalfields Ltd. 4 2 MW 14.11.2014 Solar PV Commissioned Kalinga Institute of Social Science (KISS) Not yet Registered 5 0.5 MW Solar PV Commissioned MBPS Control & Power system limited Not registered 6 1 MW Solar PV Not Commissioned

  11. Village Electrification Villages electrified Under RVEP till 11-12 : 1621 Under pilot project of MNRE : 1 Under DDG : 7 ( work in progress) Projects in pipe line: Projects under DDG : 7 Tribal hamlets/ habitation with financial assistance from MoTA: 250 Villages identified for electrification by STSC Dev. Department : 700

  12. Distribution of Solar Lanterns The program for distribution of solar lanterns to weavers and handicraft artisans started in 2013-14 Lanterns distributed till end of 2014-15 Weavers : 25,503 Handicraft Artisans: 16,428 Total 41,932 For the current year apart from weavers and handicraft artisans households using kerosene for illumination purpose in KBK region and western Odisha are also being included under the program. Target for 2015-16 : 20,000

  13. National Biogas and Manure Management Program (NBMMP) Total potential of domestic biogas plants : 6 00,000 Plants constructed till 2014-15: 2,38,872 Target for 2015-16: 5,100 Achievement till July 2015: 211

  14. Unnat Chullah Abhiyan Target for 2015-16 Family Type : 15000 Community Type : 6000 It has been programmed to construct 20,000 PARISHAD model community chulah ( with chimney) in schools & Anganwadi centers under MDM with financial support of state Govt. The said chulah has been tested in IMMT, Bhubaneswar and performance parameter is found to be satisfactory. 563 chulah have been installed till July 2015 in schools. MNRE may consider CFA for above category of chulah under UCA . .

  15. Perspective Plan till 2018-19 S/N Description of the sector year wise coverage 15-16 Total Total capacity in MW 60 16-17 17-18 18-19 1 Solar Pumping for Irrigation 3000 5000 6000 6000 20000 2 Solar Pumping for drinking water supply 4000 5000 5000 6000 20000 18 3 Electrification of tribal hamlets/ habitations 500 500 500 500 2000 10 4 Rooftop solar power plants in BJRCY Hostels 49 - - - 49 0.5 5 Rooftop solar power plants and drinking water supply in 6000 hostels under SCST Development Department 500 1500 2000 2000 6000 60 6 Provision of high mast lights and street lights in all Gram panchayats Solar electrification of government buildings in different districts 500 1500 2000 2000 6000 02 7 5MW 5MW 10 MW 10MW 30 MW 30 8 Solar power to Urban Local Bodies for substitution of power consumption on account of street lights 1MW 3MW 4MW 10MW 10MW 18 9 Distribution of solar lanterns to weavers, handicraft artisans and households using kerosene for illumination purpose in KBK region and western Odisha 20000 30000 50000 50000 150000 1.5 Total capacity 200 MW