Overview of Fuego Test System Projects and Industry Initiatives

Overview of Fuego Test System Projects and Industry Initiatives
Slide Note
Embed
Share

This content provides insights into the Fuego Test System projects, industry initiatives, and vision from June 2018. It covers various aspects such as project outlines, features in progress, and elements missing from the 1.3 release. Additionally, it discusses documentation conversion, LTS provisioning support, and the pre-built docker image for Fuego. The information presented offers a comprehensive view of the development and challenges faced in these areas.

  • Fuego Test System
  • Industry Initiatives
  • Documentation Conversion
  • LTS Provisioning
  • Docker Image

Uploaded on Apr 13, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Project Early Success Overview for Call Center Spring 2023 - 1st 8-weeks Week 2 - January 23, 2023

  2. Preparing to Make Calls Watch the training video on how to complete the call form before making calls

  3. The Call Form https://apps.ivytech.edu/apps/ext/pes Select Project Early Success

  4. Obtaining Student Lists The list will update daily Available in the Call Form app Use filters to create list of students. Can download as CSV First priority: Respond to SignalVine Requests (and log in PES system) Second: Filters to use Is at risk = yes Was contacted this cycle = no Try again with unsuccessful Students as time permits Part of term = 1st 8 weeks

  5. Avoiding Simultaneous Call Attempts Check out a student to signal active contact attempt Will check in student after you complete the call log

  6. Log Call Attempt When Finished

  7. If Successful Call Attempt

More Related Content