Simplify your document workflow with the free Adobe Acrobat Reader DC. Discover how to easily open, view, sign, and share PDF documents electronically, eliminating the need for printing, scanning, and manual form filling. Streamline your processes, save time, and reduce costs by leveraging the powerful tools available in Adobe Acrobat Reader DC.

  • PDF documents
  • Adobe Acrobat Reader
  • Form filling
  • Electronic signatures
  • Document management

Uploaded on Mar 04, 2025 | 4 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. PDF FORM FILLING Brian Heywood August 2019

  2. PDF FORM FILLING THE OLD WAY GET/DOWNLOAD THE FORM PRINT IT MANUALLY FILL & SIGN SCAN IT SHARE IT Costly & Messy

  3. THE OLD WAY A BETTA WAY GET/DOWNLOAD THE FORM GET/DOWNLOAD THE FORM PRINT IT FILL & SIGN ELECTRONICALLY SHARE IT MANUALLY FILL & SIGN SCAN IT SHARE IT Costly & Messy Much Cheaper & Neater

  4. ADOBE ACROBAT READER DC DC = Document Cloud (Since 2015) ACROBAT READER DC ACROBAT READER DC

  5. What is Adobe Acrobat Reader DC? IT S A FREE, STAND-ALONE APPLICATION THAT CAN BE USED TO OPEN, READ, SIGN, PRINT, ANNOTATE, SEARCH, SHARE & ADD TO BUT NOT REFORMAT EXISTING PDF DOCUMENTS . THERE ARE WINDOWS, ANDROID AND iOS (APPLE) VERSIONS, SO PDF FILES CAN BE VIEWED AND SHARED ACROSS ALL OF YOUR DEVICES USING CLOUD STORAGE. What is a PDF File? The Portable Document Format (PDF) is a File Format developed by Adobe in the 1990s to present Documents, which may include images, text documents, forms, books, or any combination of these. PDF was a proprietary format controlled by Adobe until it was released as an open standard in 2008. PDF documents are independent of application software, hardware and operating systems.

  6. WITH THE FREE ADOBE ACROBAT READER DC YOU CAN: Open, View, Read and Print PDF documents. Using the FILL & SIGN Tool - Complete FLAT FORMS with instant access to your personal autofill collection across desktop, web, and iPad devices. Using the COMMENT Tool - Suggest changes and add to existing PDF documents. Sign up to ADOBE DOCUMENT CLOUD for access to 2GB of FREE Cloud storage. Using the ADOBE DOCUMENT CLOUD Get easy access to your saved PDFs across all of your desktop, web, and mobile devices, and easily send and share PDFs with others. From within the Reader - Access PDFs on other CLOUD STORAGE (e.g. Dropbox, OneDrive etc).

  7. FILL & SIGN TOOL TWO TYPES OF FORMS TWO TYPES OF FORMS

  8. 1. FILLABLE FORMS 1. FILLABLE FORMS with Interactive fields with Interactive fields Please fill out the following form. You cannot save data typed into this form. Please print your completed form if you would like a copy for your records. FILLABLE FORMS are usually filled-in and transmitted online with an option to view and print the final document.

  9. Please fill out the following form. You cannot save data typed into this form. Please print your completed form if you would like a copy for your records.

  10. 1. FILLABLE FORMS 1. FILLABLE FORMS with Interactive fields with Interactive fields Please fill out the following form. You cannot save data typed into this form. Please print your completed form if you would like a copy for your records. FILLABLE FORMS are usually filled-in and transmitted online with an option to view and print the final document. NOTE: The FREE Adobe Acrobat Reader DC cannot create FILLABLE FORMS

  11. 2. FLAT FORMS: 2. FLAT FORMS: - - do not have interactive fields do not have interactive fields

  12. 2. FLAT FORMS: 2. FLAT FORMS: - - do not have interactive fields do not have interactive fields

  13. 2. FLAT FORMS: 2. FLAT FORMS: - - do not have interactive fields do not have interactive fields - ONLINE FORMS NEED TO BE DOWNLOADED AND SAVED AS PDF - HARD (PAPER) COPIES OF A FORM NEEDS TO BE SCANNED INTO PDF - NEW FLAT FORMS CAN BE PRODUCED IN WORD AND SAVED AS PDF

  14. FILL & SIGN & COMMENT TOOLS WHY USE? * TO PRODUCE NEATER (legible) DOCUMENTS. * TO SAVE PAPER No need to print. * TO SAVE EXPENSIVE INK. * TO SAVE TIME & EFFORT WITH REPEAT DOCUMENTS.