The Peruvian electricity sector has seen significant growth in energy production and demand over the years, with a focus on renewable energy resources like solar power. The sector aims to increase electricity coverage and meet the growing demand through innovative initiatives like the 1st RER Bidding for Energy Supply in rural areas. Explore the potential of solar energy, thermal, and hydraulic power in Peru's energy landscape.

  • Peru
  • Electricity Sector
  • Renewable Energy
  • Solar Power
  • Energy Production

Uploaded on Mar 14, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. PERUVIAN ELECTRICITY SECTOR Prepared to: The Federation of Israeli Chambers of Commers 2.6.14

  2. ELECTRIC ENERGY PRODUCTION National Electric Energy Production (GWh) Electric Energy Production by source (%) 2003 45,000 2013 40,000 Thermal 14% 35,000 Others 1% 30,000 25,000 20,000 15,000 Thermal 46% 10,000 Hydraulic 86% Hydraulic 53% 5,000 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Hydraulic Thermal Others Source: Committee of Economic Operation of SEIN Source: Committee of Economic Operation of SEIN The exploitation of the Camisea average annual rate of 22% for the last ten years. Camisea field has lead in the expansion of thermal generation, which has grown by an

  3. ELECTRIC ENERGY DEMAND Electricity Coverage Maximum Demand (MW) 2003 - 2013 Population with access to electricity (%) 2003-2012 84.8% 6,000 87.2% 79.5% 5,000 78.5% 78.1% 4,000 82.0% 78.7% 3,000 68.7% 76.0% 2,000 69.6% 1,000 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Source: Committee of Economic Operation of SEIN Source: National Society of Mining, Oil and Energy The growth of the country's economic activity has generated an expansion of energy demand. The maximum demand of the National Interconnected Electric System (SEIN) amounted to 5,575 MW in 2013, which is 5.4% above the prior year. Regarding the electricity coverage, it reached 87.2% in 2012. The aim is to reach 90% in the coming years.

  4. SOLAR POTENTIAL The availability of solar energy is fairly uniform throughout the year within a margin of + / - 20% of the annual average. Annual average (kwh/m2) Southern coast 6,0 6,5 Central coast 5,5 6,0 Highlands 5,5 6,0 Southern jungle 5,0 5,5 Northern jungle 4,5 5,0 Source: Ministry of Energy and Mines

  5. 1st RER Bidding for Energy Supply for Not Connected Areas Objective Objective: : Award for a 15 years period, the electricity sypply of with Renewable Energy Resources up to 500,000 consumers located in isolated rural areas. Is expected to achieve the installation of: 410,000 panels on housings. 7,500 panels on Educational Institutions. 2,100 panels on Health Stablishments. Schedule Schedule Activities Fechas Call September 12th, 2013 Registration of participants Up to August 1st, 2014 Authorizations Authorizations and rights, permissiones o licences is not required because the equipment will be installed on users property. and Permissions Permissions: : Obtaining sectorial Selling Bases Up to August 1st, 2014 Suggestions and inquires to Bases Up to May 12th, 2014 Files presentation August 5th, 2014 Competition Competition factor that shall be in accordance with the Base Remuneration established by OSINERGMIN. factor: : Annual compensation proposal, Publication of Minutes of Bidders August 22nd, 2014 Current Current Status August 2014. Status: Registration of participants up to Award September 09th, 2014 Price of Bases: US$ 1,000.00