Planning the 2019 Voltage Profile for Summer and Fall Operations

2019 summer peak and fall off peak voltage n.w
1 / 9
Embed
Share

Dive into the details of the 2019 Summer Peak and Fall Off-Peak voltage profile planning, including agenda items, case information, change submissions, and voltage profile schedule. Ensure accuracy and quality of submissions for a successful outcome. Coordinate changes with ERCOT if needed.

  • Planning
  • Voltage Profile
  • Operations
  • Summer
  • Fall

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. 2019 Summer Peak and Fall Off-Peak Voltage Profile Kick Off Operations Planning Voltage Profile Working Group (VPWG) March 5th, 2019

  2. Agenda SSWG Case and Contingency Information Change Submissions Voltage Profile Conversations Voltage Profile Schedule Additional Information

  3. SSWG Case and Contingency Information Cases: 18SSWG_2019_SUM1_U2_Final_02222019 Load: 82,831.8 MW* 18SSWG_2019_FAL2_U2_Final_02222019 Load: 45,642.9 MW* Contingencies: Autogenerated Single NERC P1 & P7 *Includes PUNs 3 PUBLIC

  4. Change Submissions Please review and verify that the information in the SSWG files are correct, including (but not limited to): generation pattern, mothballed unit information, generator reactive capabilities, and autotransformer tap settings. IDEV/CON files must be submitted with the proposed changes. For CON files, only contingencies that are being modified, added, or deleted should be included. File naming convention: [TDSP]_2019_VP_[SUM1/FAL2]_Pass[#].[IDV/CON] Example: ONCOR_2019_VP_SUM1_Pass0.IDV 4 PUBLIC

  5. Change Submissions All changes must be solved in the case with the PSSE solution file solution.idv before submittal. Changes should improve the quality and strength of the case. Changes that cannot solve in the case will not be accepted. Any issues solving the case with proposed changes may be brought to ERCOT. ERCOT will help coordinate these changes with the case and any other applicable TDSPs, if necessary. Voltage set points of ALL generation resources must be of the High Side of the GSU Transformer/POI. 5 PUBLIC

  6. Voltage Profile Conversations Please direct all emails relating to the Voltage Profile to VPWGSubmittals@ercot.com Also, copy ERCOT staff. Please include [SUMFAL19] in the subject line of these emails. This conventions reduces the possibility of ERCOT missing any emails related to our Voltage Profile Study. Example subject lines: 2019 Summer/Fall Voltage Profile - CNP Pass 0 Submission [SUMFAL19] [SUMFAL19] RE: 2019 SUMMER_FALL Voltage Profile Study Voltage Profile Pass0 Changes [SUMFAL19] 6 PUBLIC

  7. Voltage Profile Schedule Pass # Pass 0 Pass 1 Pass 2 Pass 3 Final Pass Review Meeting Posted ERCOT Scheduled Date 3/6/2019 3/27/2019 4/24/2019 5/8/2019 5/22/2019 5/21/2019(?) 6/1/2019 TDSP Submittal Date 3/20/2019 4/10/2019 5/1/2019 5/15/2019 Review Spreadsheet 2 weeks 2 weeks 1 week 1 week ERCOT will send out interim updates during passes that will contain: Change requests/solutions received from TSPs (tracking sheet); Updated profiles; Any outstanding issues. 7 PUBLIC

  8. Additional Information PSS/E Version: ERCOT will be using the PSS/E Version 33.5.2 during the studies. Power World Version: ERCOT will be using Simulator 19 during the studies. 8 PUBLIC

  9. Questions? Thank you! PUBLIC