Potential Changes to CDR NPRR1219 Language & Battery Energy Storage Design Duration Classes

potential changes to cdr nprr1219 language n.w
1 / 4
Embed
Share

Astrap Consulting models Effective Load Carrying Capability for energy resources, potentially modifying NPRR language regarding battery storage. ERCOT proposes changes in ELCC language and implementation timeline.

  • Energy
  • Resources
  • NPRR
  • ERCOT
  • Implementation

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Potential Changes to CDR NPRR1219 Language Pete Warnken Resource Adequacy Supply Analysis Working Group April 19, 2024

  2. Battery Energy Storage Design Duration Classes Astrap Consulting is developing a modeling approach to determine the Effective Load Carrying Capability ( reliability value ) of one MWh of energy Given mixes of wind, solar, and battery storage resources and based on the proportions of energy versus capacity shortages for loss-of-load events with a range of durations ELCCs can be determined for different battery durations With this approach, assigning battery storage units to duration classes can be avoided If the energy ELCC approach works out, then ERCOT will submit NPRR comments modifying the language regarding battery storage ELCCs 2 ERCOT Public

  3. Clarification on Annual vs. Seasonal ELCC Language NPRR language cites average annual ELCCs several times. This term was used because ELCC derivation involves annual estimation followed by seasonal calculations. A commenter thought that this was confusing given that the CDR will be based on seasonal ELCCs To avoid confusion, ERCOT is proposing deleting annual from the NPRR language as shown below: 3 ERCOT Public

  4. NPRR Implementation Timeline ERCOT expects to implement all the proposed changes over the course of multiple CDR releases If the Commission approves the NPRR by fall 2024, ERCOT would introduce the more modest and straightforward changes for the December 2024 CDR; the more consequential changes would be targeted for the May 2025 release and possibly the December 2025 release ERCOT will keep SAWG apprised on the timeline for the specific changes once more clarity on time NPRR timeline 4 ERCOT Public

More Related Content