Progress and Status of National Hydrology Project by SK Sinha - IBD (SGO) Survey of India

progress status of national hydrology project n.w
1 / 18
Embed
Share

Get an update on the progress and status of the National Hydrology Project presented by SK Sinha, Director of IBD (SGO) Survey of India, during the 1st World Bank Mission on 24 August 2017 in New Delhi. Explore funding details, major procurement items, and components of the project. Stay informed about the funds received and spent, along with key activities and developments.

  • Hydrology Project
  • SK Sinha
  • National Hydrology
  • Survey of India

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Progress/Status of National Hydrology Project Presented by SK Sinha, Director, IBD(SGO) Survey of India 1stWorld Bank Mission on 24th August, 2017 New Delhi.

  2. CPMU SOI(IA) Maj Gen VP Srivastava Surveyor General of India Chairman Shri Shyam Veer Singh, Director, National Geospatial Data Centre, Dehra Dun Shri KK Soni, Director, Administration&Finance Project Director & Member Member Smt Bindu Manghat, Director, Western Printing Group, Delhi Nodal Officer & Member

  3. Funds Received/Spent PPlan Total 9,00,00,000 2016-17 Released 2017-18 Released 7,63,02,000 1,36,98,000 38,37,00,000 4,15,00,000 42,52,00,000 Total Released 46,00,02,000 5,51,98000 51,52,00,000 Expenditure (2017-18) -- 64,63,605 64,63,605

  4. Major Procurement item in PIP

  5. Component B1.1: Strengthening National WRIS Activity Fund catered (in lakhs) ItemCode Setting up of Geospatial Data Production Centre for 10m DTM 328.00 B1.1.1 to 4 Setting up of Geospatial Data Production Centre for 3-5m DTM 748.00 B1.1.5 to 8 Setting up of Geospatial Data Production Centre for 1:25k gdb from topomaps(creation and updation) 1265.60 B1.1.9 to 16 Setting up of Geospatial Data Production Centre for LIDAR Survey 1500.00 B1.1.17 3841.00 B1.1.18 Setting up of CORS 706.00 Vehicles for field operations and QA/QC of LIDAR survey. 210.00 B1.1.19 Total of B1.1 component 4757.60

  6. Component B1.2: Development / Procurement of Spatial Databases Activity Fund catered (in lakhs) 925.00 ItemCode Production of 10m DTM B1.2.1 Production of 3-5m DTM 2503.00 B1.2.2 Production of 1:25k gdb from topomaps(creation and updation) 4800.00 B1.2.3&4 7303.00 Geoid modelling 1280.00 B1.2.5 Provision and densification of frame work GCPs for LIDAR survey 64.00 B1.2.6 Acquisition, processing and QA/QC of LIDAR Survey Data 10669.00 B1.2.7&8 Total of B1.2 component 20241.00

  7. Major Procurement item in AWP

  8. Cost in Lacs PID Package Name Status Activities ID PP Cleared by WB/Submitted to MoWR and observations received/Observations incorporated and under Departmental approval PP Cleared by WB/NCB under preparation PP Cleared by WB/EoI evaluation report &RFP submitted to MoWR/Observations of MoWR incorporated and under Departmental approval 492 484.5 Absolute and Relative gravimeters B1.2.05.01 493 50 Survey Instruments for Geoid modelling B1.2.05.02 Hiring of consultant for setting upof H/W infrastructure for geospatial data production centres D4.1.07.01,B1.1.01.01, B1.1.05.01 30 495 Hiring of Procurement , Contract Management and Project Management specialists PP Cleared by WB/Bid document under preparation D4.1.08.01,D4.1.09.01, D4.1.10.01 54 505 PP Cleared by WB/ under Departmental approval PP cleared by WB/Items identified for procurement by GeM PP cleared by WB/Items identified for procurement by GeM PP received with observations/Items identified for procurement by GeM 20 507 Procurement of Vehicles for PDO D3.1.05.01 40.02 508 Workstations and Laptops for PDO D3.1.01.01 24.38 510 Furniture for PDO D3.1.03.01 46.57 511 Setting up of PDO, Dehra Dun D3.1.04.01 519, 1002 PP Cleared by WB, bid document to be prepared with help of consultant B1.1.01.02,B1.1.02.01,B1.1.0 5.02, B1.1.06.01 750 Setting up of geospatial Data Production Centres 47 524 Scanners and Plotters PP Cleared by WB B1.1.02.02,B1.1.06.02 Returned by WB with comments. Comments under incorporation. Exact nos being finalized 537, 1011 Geospatial Software and data management software 597.93 B1.1.01.03,B1.1.05.03 121 538 Setting up of Production facility at multiple locations PP Cleared by WB. B1.1.11.01 Scanners and Plotters 103 1014 PP Cleared by WB B1.1.10.02

  9. Cost in Lacs PID Package Name Status Activities ID Cost satellite imagery and software/hardware for updation of 1:25k gdb 1016 285 Returned by WB with comments B1.1.13.01 1017 181 Additional hardware and software for updation PP Cleared by WB PP Cleared by WB/Bid document submitted to MoWR/Comments incorporated and refined with inputs from trainees from ITC/Under departmental approval B1.1.14.01 Lidar survey- acquision and processing including setting up of geospatial data production centre 2920 1018 B1.1.17.01,B1.2.07.01 PP Cleared by WB to be modified to Consultant Services for QA/QC 30 1019Hiring of Consultant for Lidar Survey B1.1.17.03 PP Cleared by WB . Bid document under preparation Returned by WB with comments. Bid document under preparation 30 1020Hiring of consultant for setting up of CORS B1.1.18.02 676 1021Setting up of CORS at Varanasi B1.1.18.01 100 PP Cleared by WB 1022Procurement of vehicles at multiple locations B1.1.19.01 PP Returned by WB with comments. Bid document finalized and under submission 1600 Creation of 3-5m RMSE DEM and updated 1:25k database of Priority I river basins B1.2.02.01,B1.2.03.01, B1.2.04.01 1035 30 1065Hiring of consultants (Geoid) Returned by WB with comments- B1.2.05.03

  10. Project Deliverables 10m DTM of entire country 0.5M RMSE DTM BY LIDAR SURVEY OF P-1 AREA (Approx. 55,000sq km) IN 3YEARS 3-5m DTM + updated gdb of 1:25k scale survey 1ST YEAR P1 AREA, 2ND YEAR- P2 AREA 3RD YEAR P3 AREA(Approx .5LAKH SQ KM) GEOID for execution in CORS AT VARANASI P-1 AREA CAPACITY BUILDING OF SOI OFFICERS IN LIDAR SURVEY, GEOID DEVELOPMENT, CORS , PROJECT MANAGEMENT etc

  11. 10m DTM Data ready for supply Data Indent form O.57(b) is under submission by MoWR

  12. 3-5m DTM and updated gdb Bid document is under submission by the board. Processing centres to be finalized. Board has recommended proprietary s/w + workflow for adoption in bidding document. Indian HRSI with MSS from NRSC Allotted Area likely to be revised. Gap areas to be allotted to NRSC on their request. Final decision of MoWR is awaited.

  13. Generation of Geoid model IndGeoid of 30cm accuracy developed by G&RB for western and northern part of India with support of Mr Rene Forsberg of DTU. Officers from G&RB have trained at DTU, Denmark. Final tender document for Abs & relative gravimeters received from MoWR with comments. Modified bid document is under departmental approval. WB observation on hiring of consultant from Single source-Justification to be provided by the board, followed by the proposal Bid for procurement of Survey Instrument is under preparation. Comprehensive PERT proposal on Geoid development under preparation by G&RB. Planning for field in advanced stage. Field induction to be done shortly.

  14. LIDAR survey Draft bid document submitted by SoI. Observations received from MoWR. Technical specification further refined by subcommittee of ITC trained officers. Area allocation likely to be revised. MoWR has to replace part of Brahmaputra, Godavari and Mahanadi basins as they are already surveyed by NRSC-to be pursued with MoWR. High resolution photography carried out in Bihar & Odisha can be used for DEM creation. Bid document to be finalized on finalization of re-allotted area

  15. STEP-World Bank approval mechanism of Procurement activity under NHP MoWR approved procurement plans for FY 2016-17 and 2017-18 have been collectively uploaded in the STEP. WB cleared all activities with certain observation which have to be incorporated

  16. STEP-World Bank approval mechanism of Procurement activity under NHP World Bank Returned Activities . Activity Reference No Activity Description IN-SOI-22154-GO-RFQ Setting up of PDO-Electification, partitioning, networking procurement of office instruments, AC etc IN-SOI-22198-GO-DIR Geospatial Software and Data management software-Bentley PD has to take action on the observation map, ESRI, FME, Oracle, LIDAR processing s/w etc IN-SOI-23020-GO-DIR Cost of Satellite imagery and software/hardware for updation of 1:25k gdb. IN-SOI-23213-CS-QCBS Creation of 3-5m DTM and updated 1:25k database of Priority 1 river basins IN-SOI-23214-CS-QCBS Setting up of CORS at Varanasi IN-SOI-23683-CS-INDV Consultant for Geoid modeling-Hiring of IN-SOI-23699-NC-RFQ Digitizers of skill level 1 to 4

  17. Status and Way forward STATUS All critical bid documents like 3-5 m DEM/LiDAR Survey /Gravimeters already prepared and under Departmental approval. Comprehensive proposal on Geoid development is being prepared by G&RB Bid document(CS-ICB) for CORS is under preparation Bid document(W-NCB) for Lidar Survey is under preparation. Area for the survey to be finalized. Bid for Procurement, Contract Management, Project Management consultants through consultant firms is under preparation. Preparatory and Planning work for meeting the obligations of SoI for works to be carried out by itself/or inputs to be provided to Contractors in advanced stage Officers being trained in Key areas like LiDAR survey, Geoid Development, Project Management etc (3 officers trained at IIM, Ahmedabad (3 officers trained at DTU, Denmark,20 officers trained at ITC, Netherlands ) Hiring of Consultant firm for Setting up of Geospatial Data Production Centres- EOI evaluated- Six firms qualified for RFP Stage WAY FORWARD PDO being further staffed and roles/responsibilities being re-aligned to cater to Execution phase All bid documents to be submitted shortly Execution/Monitoring Mechanism being put in place to complete tasks and submit deliverables as per timelines in a phased manner.