Progress Report Presentation in Electrical & Electronic Engineering
"Explore the progress report presentation of EEE 400 first-term project at the Department of Electrical & Electronic Engineering, Independent University, Bangladesh. Delve into background, motivation, literature review, proposed system, research methodology, work plan, and expected outcomes."
Uploaded on | 0 Views
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
EEE 400 PROGRESS REPORT PRESENTATION (1ST TERM) Presentation title 36 points Arial bold Centered Presented by: Presenter 1, Presenter 2, Presenter 3 Department of Electrical & Electronic Engineering INDEPENDENT UNIVERSITY, BANGLADESH Supervisor: Prof. Md. Abdur Razzak Presenters short name Short Title Page 1/20
Outline Background, Motivation and Objectives Existing systems and related works (literature review) Problems and challenges in the existing systems Possible solutions and objectives Research Methodology Proposed System Work Plan RACI matrix and Gantt Chart Expected outcome of the project Impact of project outcome on the societal, health, safety, legal and cultural issues environment and sustainability Proposed budget overall budget and component/software budget Addressing Complex Engineering Problems and Knowledge Profile Summary Presenters short name Short Title Page 2/20
Background and Motivation Use 2 to 4 pages to state the background of this project (preferably either pictorial or using block diagram) and why you are motivated to pursue this project Presenters short name Short Title Page 3/20
Background and Motivation (contd..) Use 2 to 4 pages to state the background of this project (preferably either pictorial or using block diagram) and why you are motivated to pursue this project Presenters short name Short Title Page 4/20
Background and Motivation (contd..) Use 2 to 4 pages to state the background of this project (preferably either pictorial or using block diagram) and why you are motivated to pursue this project Presenters short name Short Title Page 5/20
Background and Motivation (contd..) Use 2 to 4 pages to state the background of this project (preferably either pictorial or using block diagram) and why you are motivated to pursue this project Presenters short name Short Title Page 6/20
Literature Review (most related journals / conferences) Reference Limitations / Problems / Challenging issues requires components which make the project complex as well as costly. Stability of the system will also be challenging. Sl Outcome Proposed Solution (Journal / Conference papers M. A. Razzak and Bing Zeng, A Constant Current Immittance Conversion Circuit , IEEE International Conference on Circuits and Systems, 14-18 December, 2011, Sydney, Australia, pp. 746-751. 1. Provide constant current for dynamic load i.e. the load power will not be changed even when the load changes. It more Should be provided a simple topology which will make the system less complex, low cost as well as stable and robust. 2. 3. List at least 3 most recent journal papers you have reviewed. In case of unavailability of journals, list most recent conference papers. Presenters short name Short Title Page 7/20
Problem Statement & Objectives After literature review, the following major problems are discovered and needed to be addressed: Xx Xx Xx The objectives of the proposed system are: Xx Xx Xx Presenters short name Short Title Page 8/20
Research Methodology example Design using PSIM Simulation Making Hardware Prototype Review Literature Analyze Results Perform Experiment Presenters short name Short Title Page 9/20
Proposed System example Presenters short name Short Title Page 10/20
Work Plan RACI Matrix Responsible (R), Accountable (A), Consulted (C) & Informed (I) - RACI Matrix Name (Supervisor) 1 C R I R C A I R Period Assignments Start End Days Status Group Member Group Member 2 R A R R Group Member 3 R R A R Prepare Plan Review Literature Problem Identification Prepare Draft Budget Prepare, Submit & Present (Proposal, Progress Presentation & Progress Report) Project Design (specify the work) Simulation / Hardware (specify the work) Prepare, Submit & Present (Presentation & Progress Report) Testing prototype Result & Analysis Prepare, Submit & Present (Final Report & Presentation) Prepare Poster & Present Group Demonstration 01.05.2021 16.05.2021 16.06.2021 01.08.2021 30.05.2021 30.08.2021 30.08.2021 30.08.2021 30 105 75 30 1st Term I A A A 18.08.2021 07.10.2021 50 C R R R 01.10.2021 30.11.2021 60 2nd Term C R R R 01.11.2021 30.12.2021 60 I A A A 01.12.2021 15.01.2022 45 C C R R R R R R 01.01.2022 01.02.2022 25.02.2022 30.03.2022 55 60 Final Term I A A A 01.03.2022 30.04.2022 60 I A A A 01.04.2022 30.05.2022 30 Presenters short name Short Title Page 11/20
Project Plan Gantt Chart 1st Term 2nd Term 3rd Term Task Name May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 Prepare Plan Research Literature Problem Finding Prepare Draft Budget Prepare & Submit Project Proposal Prepare & Submit 1st Term Progress Report Prepare & Present 1st Term Progress System Design Prototyping (Simulation) Prepare & Submit 2nd Term Progress Report Prepare & Present 2nd Term Progress Prototyping (Hardware) Testing & Evaluation Final Report Final Presentation Project Demonstration Presenters short name Short Title Page 12/20
Expected outcome of the project The following outcome are expected from the proposed project: Xxx xxx Presenters short name Short Title Page 13/20
Impact of project onsocietal, health, safety, legal & cultural issues Social impact: Health & safety issues: Legal & cultural issues: Presenters short name Short Title Page 14/20
Impact of project on the environment & sustainability Technical: Economical: Environmental: SDG 2030: SDG 7 Clean & Affordable Energy, SDG 13 Climate action, SDG 15 Life on land (for example) Presenters short name Short Title Page 15/20
Overall Budget to Implement the Project Sl Item Justification Price (BDT) 1. Project planning cost 20,000 2. Human resource cost 25,000 Software license / hardware components cost Project evaluation & report cost Others cost including monitoring & control, documentation etc. Total (BDT) In words: Sixty six thousand only 20,000 3. 1000 4. 10,000 5. 66,000 Presenters short name Short Title Page 16/20
Components / Software Budget to Implement the Project Unit Price (BDT) Price (BDT) Sl Item Specifications Justification Qty 1. 2. 3. 4. 5. 6. 9,450 Total (BDT) In words: Taka Nine Thousand and Four Hundred and Fifty Only. Presenters short name Short Title Page 17/20
Addressing complex engineering problems Attributes Addressing complex engineering problems in the project Depth of knowledge required (WK3-WK5, WK8) WP1 Range of conflicting requirements WP2 WP3 Depth of analysis required WP4 Familiarity of issues WP5 Extent of applicable codes Extent of stakeholder involvement WP6 WP7 Interdependence Presenters short name Short Title Page 18/20
Summary xx Presenters short name Short Title Page 19/20
Any questions, comments or suggestions? Presenters short name Short Title Page 20/20