Project Discussion and Plans for SCD & HERD at IHEP

work plan discussion for scd n.w
1 / 6
Embed
Share

Explore the work plan and phases for the SCD and HERD projects led by Wenxi Peng and Rui Qiao at IHEP. Delve into the detailed phase definitions, key goals, Chinese contributions, and projected timelines for the projects. Discover how the teams aim to achieve specifications and contribute to the advancement of ion beam testing and detector development.

  • Project Discussion
  • SCD
  • HERD
  • IHEP
  • Phase Definitions

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Work plan discussion for SCD Wenxi Peng, Rui Qiao pengwx@ihep.ac.cn, qiaorui@ihep.ac.cn IHEP&PMO

  2. Plans for HERD project Aim to launch HERD in 2027 We expect HERD project will be officially approved by CMSA and CSU in 2023 However, the chief leader of CSU suggest we should start the Phase A in 2022.

  3. Phase definition for HERD Phase A: 2022.1~2023.12 Concept deign and prototype development. Phase B: 2024.1~2026.6 Design for EQM and develop EQM Phase C: 2026.1~2027.12 Finalize the design and FM fabrication

  4. Phase A 2022.1~2023.12 Concept deign including designs of sensors, ladders, electronics(Front-end &DAQ), mechanics, thermal and all kinds of interfaces. Key goal: to achieve the specifications as required. for SCD: Charge measurement Z=1~26 SCD Specification Beam test with Prototype Coverage rate of CALO >80% Geometry design Charge resolution <0.1 c.u @Z=1 <0.2 c.u @Z=6 Beam test with Prototype Dead time <1ms Electronics design

  5. Chinese contribution On our side, IHEP will lead the Chinese team (including PMO colleagues ) and propose to contribute one side of SCD in HERD. In the next year, as a complement, we will develop several SSD ladders with different strip width and pitch size for the ion beam test.

  6. Thanks!