Project Overview: Florida Department of Transportation Design Project

ad 26114 fpid 450671 n.w
1 / 14
Embed
Share

"Explore the design project managed by Jennifer Freeman for the Florida Department of Transportation, covering important CAP dates, anticipated work groups, project scope, funding details, and the technical review committee. Learn about the project manager's experience, key responsibilities, and contact information."

  • Design Project
  • Transportation
  • Florida DOT
  • Jennifer Freeman
  • Project Management

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Ad # 26114 FPID 450671-1-32-01 SR 25 (US 27) AT FLAGHOLE RD Design Project Manager: Jennifer Freeman 863-519-2543 Florida Department of Transportation

  2. Important CAP Dates: Advertisement: Contact ceases with all FDOT staff (except PSU) Procurement Method: ELOR Response Deadline: May 27, 2025 Shortlist Selection: Final Selection: No debriefs until 72 hours after final selection May 12, 2025 June 24, 2025 July 15, 2025 Florida Department of Transportation

  3. Anticipated Work Groups Major Work Type: 3.1 Minor Highway Design 4.1.1 Miscellaneous Structures Signing, Pavement Marking, and Channelization Control Surveying Design, Right of Way, and Construction Surveying 7.1 8.1 8.2 Florida Department of Transportation

  4. Project Overview FM 450671-1 Florida Department of Transportation

  5. Project Overview Project Scope Rigid pavement reconstructon Signing/Pavement Marking Survey 3D Design Variations No keyhole Utility Coordination SUE Florida Department of Transportation

  6. Funding Design 450671-1-32-01 $850,000 in FY 2026 Right-of-Way No Right-of-Way Anticipated Construction 450671-1-52-01 $5,089,676 in FY 2028 Florida Department of Transportation

  7. Technical Review Committee (TRC) David Henders on Jennifer Freeman Randy Lachler Florida Department of Transportation

  8. PM/TRC: Jennifer Freeman, Consultant Project Manager 11 years with FDOT 4 Years in Financial Services 4 Years in Materials 3.5 years in Project Management Hot Button: QA/QC Contact Information: (863) 519-2543 Jennifer.Freeman@dot.state.fl.us Florida Department of Transportation

  9. Florida Department of Transportation

  10. Design TRC: Randy Lachler, Roadway Engineer I 26 years with FDOT P.E. Trainee Program 4 years Structures 2 years Roadway Design 20 years Contact Information: 863-519-2548 Randy.Lachler@dot.state.fl.us Florida Department of Transportation

  11. Documents on PSUs FTP site: 4P Technical Scope Typical Sections As-Builts LRE Florida Department of Transportation

  12. TRC Considerations for your ELOR This is what we want to see in your letter. Project approach: understanding scope, unique project issues, safety and context. Relevant staff experience and knowledge of rigid pavement design processes. Approach to constructability of concrete on the side road to allow access? How will the MOT be phased so it is aligned with the concrete joints? Quality of the letter. Florida Department of Transportation

  13. Suggestions for the Letter of Interest Listen to your TRC. Use of graphics should add value to the letter. TRC prints in black and white, so colors may not be correctly represented. This TRC prefers a two-column format. If you reference a specific project, please include contact information. Check for grammatical errors. It is a direct reflection on your QC abilities. Include key staff and years of experience, but don t overload with resume information. This letter is your chance to stand out, so make it count. Be sure to check PSU s marketing site for updates. Florida Department of Transportation

  14. If you would like to schedule your 20-minute marketing meeting, please follow this link: https://outlook.office365.com/owa/calendar/D1TRCMarketi ngMeetings@fldot.onmicrosoft.com/bookings/s/VWRM6U fB3EibnendUi7PbQ2 Meetings are being held on: 4/23/2025 4/30/2025 5/1/2025 This time is for you to ask questions and get clarification, so be prepared to ask the TRC questions. This is not the time to market yourself, that is what your letter is for. Florida Department of Transportation