Public Information Centre - Lindsay Street Sewer and Watermain Extension Project
Detailed information on the Lindsay Street Sewer and Watermain Extension Project, including design options, key issues, solutions, project schedule, and objectives outlined by Valdor Engineering Inc. Access detailed design plans and construction information for the project's completion.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Welcome! Welcome to the Public Information Centre for the Lindsay Street Sewer and Watermain Extension Project Please Sign In The purpose of this meeting is to present the detailed design options for the project. Take your time and review the project materials and displays that are presented. The City of Kawartha Lakes and Valdor Engineering staff are available to discuss any questions or concerns you may have. The City is completing this project in order to provide Municipal services to lands between Logie Street and Highway 7 as well as the Gateway Residential Subdivision at the NE corner of Lindsay Street and Highway 7. This Project is expected to be completed pending Council Budget Approval. VALDOR ENGINEERING INC.
Public Information Centre Objectives The objectives for this Public Information Centre are outlined below: Present the engineered design plans and options for the project. Demonstrate how the design options will address the Key Issues & Opportunities identified by the City of Kawartha Lakes for this project. Provide construction information so residents understand how the project will unfold. Present the proposed schedule for the project. Provide a final opportunity for stakeholders to comment prior to construction. VALDOR ENGINEERING INC.
Key Issues and Solutions Key Issues were identified at the commencement of the project. Below is a summary of those issues and how they are addressed by the proposed design. These elements are shown on the detailed design drawings that follow. Issue: Only private sanitary and water servicing currently available on Lindsay Street between Logie Street and Highway 7. Municipal services also need to be extended to service the Gateway Residential Subdivision currently under construction. The proposed construction extension will provide water and sanitary connections to businesses on the east side of Lindsay Street giving them the option to connect to them in the future and will complete the servicing requirements to the Gateway Subdivision. Solution: Location of the Services: Issue: Option 1 Install the services within the paved road allowance which will require more road reconstruction and traffic disruption. Option 2 Install the services within a road widening on the east side of Lindsay Street however not all the land is available to permit that. This option will minimize road and traffic disruption. Install the services within a road widening on the east side of Lindsay Street for ease of construction and to minimize traffic disruption. Work with land owners to permit access to their lands. Solution will not affect other utilities in the ground such as hydro, gas and telecommunications. Solution: VALDOR ENGINEERING INC.
Project Schedule Below is the project schedule: October 2024 Public Information Centre December 2024 Complete Detailed Design Construction Pending on Budget Approval By Council Construction Info Lindsay Street will remain open during construction - lane restrictions will be required to complete installation of the underground infrastructure. More restrictions will apply and possible closing of the road if Option 1 is selected. Access will be maintained to all residences and businesses during construction. There will be 48 hours notice provided prior to any access interruption. A representative of Valdor Engineering will be on site during construction and available to answer any questions or address issues that arise. VALDOR ENGINEERING INC.