Recent EGNRET Activities: Summary, Projects, and Concepts
This content provides updates on recent EGNRET activities including summaries, project status, projects approved for implementation, and concept notes approved in 2012. The information includes details on completed projects, ongoing projects, approved projects for 2012, and upcoming events. It showcases the advancements and initiatives in the field of energy efficiency, renewable energy technologies, and smart grids within the APEC region. Stay informed about the progress and future directions of EGNRET.
Uploaded on | 1 Views
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Recent EGNRET Activities Cary Bloyd Pacific Northwest National Laboratory EGEEC-39 Sydney, Australia February 27-28, 2012
EGNRET Summary EGNRET Chair is Dr. Tom Lee, Chinese Taipei EGNRET-39 will be held June 18-19, 2012 in Wellington, New Zealand EGNRET-38 will include one associated workshop Stock-take of Electric Vehicle Interface with Electricity and Smart Grids Across APEC Economies and the Potential for Harmonization (EWG 11/2011) implemented by New Zealand Information at: www.egnret.ewg.apec.org
Project Status Two projects were completed in 2011 Six projects are ongoing Three Projects have been approved at the concept note level for 2012
Projects approved for implementation in 2012 (1) Best Practices in Energy Efficiency and Renewable Energy Technologies in the Industrial Sector in APEC Region (Thailand) Piloting Smart/micro Grid Projects for Insular and Remote Localities in APEC Economies (Russia) Prospects for Marine Current Energy Generation in APEC Region (Russia)
Projects approved for implementation in 2012 (2) Promotion of Energy Efficiency and Renewable Energy in Low Carbon Model Town of APEC through Distributed Energy Source Identification of Potential, Challenges and Solutions (China) EWG 22/2011A, APEC Workshop on Paths Toward Sustainable Low Carbon Economies based on Rationale Use of Renewable Energies (China) EWG 11 2011, APEC 21st Century Renewable Energy Development Initiative (Collaborative IX): Stock-take of electric vehicle interface with electricity and smart grids across APEC economies and the potential for harmonization (New Zealand)
Concept notes approved in 2012 EWG 5/2012 Promoting the Technologies of Low Carbon Power Generation and Low Cost CO2 Capture in APEC Developing Economies (China) EWG 9/2012 Study of Demand Response s Effect in Accommodating Renewable Energy Penetration in the Smart Grid (China) EWG 07/2012 Small Hydro and Renewable Grid Integration Workshop(Viet Nam)