Remedial Alternatives for Landfill Site Management

Remedial Alternatives for Landfill Site Management
Slide Note
Embed
Share

In this project, you will explore various remedial alternatives for managing a landfill site, including options like impermeable caps, confining walls, and more. Step-by-step instructions are provided for setting up models and conducting analyses to assess the effectiveness of different approaches. Dive into environmental engineering solutions for sustainable waste management practices.

  • Remedial alternatives
  • Landfill site
  • Sustainable waste management
  • Environmental engineering
  • Model setup

Uploaded on Feb 24, 2025 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Project 3 Hints

  2. Landfill Site Landfill

  3. Remedial Alternatives Alternative A - Do Nothing Alternative B - Impermeable Cap Alternative C - Cap and Confining Wall Alternative D - Cap, Slurry Wall and Drain Alternatives E, F and G Your Alternatives

  4. Part A Create the working directory C:\temp\Proj3a Download the Vista1.gwv.zip file (from class webpage) Un-Zip the file to get the file Vista1.gwv Place the file in the working directory Open the model Vista1 Run the model (steady state)

  5. Part a

  6. Part B Create a new working directory C:\temp\Proj3b Keep a separate working directory for each part, so you can back up if you make a mistake Save (or copy) the file Vista1.gwv from C:\temp\Proj3a to C:\temp\Proj3b Select MODELS PATHS TO MODELS Set working directory to: C:\temp\Proj3b

  7. Part b - Transient Model Setup In Part B: Convert the model to a transient model with 1 stress period

  8. Stress period Types Select: Stress Period Types Set all to transient Set up the Stress periods Stress period length = 972,000,000 seconds (= 30.82 years) 20 time steps Time step multiplier of 1.5

  9. Specific Yield Set specific yield = 0.28

  10. Part b - Initial Heads Select: Model MODFLOW Package Options Initial Heads tab Select: Initial Head Location: Read Heads Directly from Binary Head Save File Browse Select: *.hds file from Part A MAKE SURE THE Part A HDS FILE IS IN A DIFFERENT FOLDER FROM THE PART B FILES!

  11. Part B Impermeable Cap Set recharge over cap area to 0

  12. Recharge

  13. Part C Confining Wall Use a Wall BC set K ~0

  14. Confining Wall Wall C15 C35 R30 Landfill R45

  15. Part d - Drains Note

  16. Part d - Drains Wall Drain C15 C35 R30 Landfill R45

Related


More Related Content