
Residential IoT and Network Service Requirements for PIRATES Report
Discover the progress and planning made in the PIRATES meeting regarding the Personal IoT and Residential networks service requirements. Explore completion dates, history, and work plans between meetings to ensure effective coordination and documentation of missing requirements.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
S1-213230 (revision of S1-20xxxx) PIRATES status report Personal IoT and Residential networks Service Requirements Adrian Buckley vivo Mobile Communications Co Ltd PIRATES Rapporteur 3GPP TSG-SA WG1 Meeting #95-e 1 Electronic Meeting, 23 August 2 September 2021
PIRATES Progress Progress made at this meeting TS 22.261, following CRs CR#0533 5G LAN related requirements from FS_Resident CR#0534 Application Server requirements from FS_Resident CR#0535 Definitions and abbreviations CR#0536 General introduction CR#0539 Requirements Work/Study Item Completion: 85% Controversial issues None 2
PIRATES Planning Planning for subsequent meetings SA1#96e (Nov 2021): 100% CRs to finish adding requirements CR on definition of non 3GPP device Cleanup CRs if needed. 3
Work plan between meetings Email / conference call coordination Identify and document missing requirements from FS_PINs and FS_RESIDENT. Definition of non 3GPP device Other issues 4
PIRATES Completion Date Current expected completion dates: For completion: SA#94 (12/2021) Have these dates been changed at this meeting? N 5
PIRATES History This WI has been agreed at SA1#95e / SA#93e Agreed WID is in tdoc S1-213263 / SP-21AAAA History of completion rates SA1#95e (08/2021): 85% 6