Resource Efficiency for MBS Reception

cc for fs 5mbs ph2 n.w
1 / 10
Embed
Share

Document reordering strategies and resource efficiency in MBS reception for RAN sharing scenarios. Evaluation of key issues, proposals, and approvals from industry stakeholders like Ericsson, Nokia, Qualcomm, and ZTE.

  • Resource Efficiency
  • MBS Reception
  • RAN Sharing
  • Document Reordering
  • Industry Stakeholders

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. CC for FS_5MBS_Ph2 LiMeng

  2. Agenda Document reordering; Resource efficiency for MBS reception in RAN sharing scenario (LSs); KI#1; KI#2; KI#3; KI#5; LS out proposals; TS proposals;

  3. Document reordering See the latest chairman s note at the following link: https://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_154_Toulouse_2022-11/INBOX/Chair_Notes/ChairNotes_Tao_11-09-1525.doc Handling of Solution update documents: Proposal: lower priority, open them once we go through all other papers.

  4. Resource efficiency for MBS reception in RAN sharing scenario 9.18.1 S2-2210174 LS from RAN WG3: LS on the scope of resource efficiency for MBS reception in RAN sharing scenario RAN WG3 (R3-225229) 9.18.1 S2-2210175 LS from TSG RAN: Reply LS on the scope of resource efficiency for MBS reception in RAN sharing scenario TSG RAN (RP-222678) View 1: Potential alignment in normative phase (Ericsson) 9.18.1S2-2210251 LS OUT Approval [DRAFT] Reply LS on the scope of resource efficiency for MBS reception in RAN sharing scenario Ericsson Rel- 18 FS_5MBS_Ph2, NR_MBS_enh, NR_MBS_enh-Core Response to S2-2210174 View 2: Not pursue in Rel-18 study phase and normative phase (Nokia, Qualcomm, ZTE) 9.18.1S2-2210821 LS OUT Approval [DRAFT] Reply LS on on the scope of resource efficiency for MBS reception in RAN sharing scenario [DRAFT] Reply LS on the scope of resource efficiency for MBS reception in RAN sharing scenario [DRAFT] Reply LS on the scope of resource efficiency for MBS reception in RAN sharing scenario Nokia, Nokia Shanghai-Bell Rel- 18 FS_5MBS_Ph2 Revision of (Merged and Withdrawn) S2- 2208285. Response to S2-2210175 9.18.1S2-2210762 LS OUT Approval Qualcomm Rel- 18 NR_MBS_enh-Core Revision of (Merged and Withdrawn) S2- 2208869. Response to S2-2210175 9.18.1S2-2210323 LS OUT Approval ZTE Rel- 18 FS_5MBS_Ph2 Response to S2-2210175

  5. KI#1: Evaluation and Conclusion 9.18.1 S2-2210530 P-CR Approval 23.700-47: KI#1: Further evaluation and conclusion update based on RAN feedback. 23.700-47: KI#1, Update to Conclusion. 23.700-47: KI#1, update the conclusion for KI#1. 23.700-47: KI#1 conclusions update. 23.700-47: Conclusions for KI#1. Huawei, HiSilicon Issue x: The procedure sending per-UE information from AF to 5GC View a: Using External parameter provisioning procedure; View b: Using MBS Session Creation procedure; 9.18.1 S2-2210252 P-CR Approval Ericsson 9.18.1 S2-2210326 P-CR Approval ZTE 9.18.1 S2-2210578 P-CR Approval CATT 9.18.1 S2-2210750 P-CR Approval Qualcomm Incorporated Nokia, Nokia Shanghai Bell, ZTE Issue y: The parameters used to represent the preliminary UEs sending from 5GC (SMF) to NG-RAN nodes View a: Using a dedicated IE to represent that the certain UE is suggested to be kept in RRC_CONNECTED state; View b: Using current existing parameters e.g., ARP, 5QI, or Expected Activity Period; 9.18.1 S2-2210822 P-CR Approval 23.700-47: Updates to Conclusion for key issue 1. 23.700-47: KI1#, discussion and proposal on the LS response from RAN WG2 and RAN WG3 for the KI#1. 9.18.1 S2-2210325 P-CR Discussion Issue x Issue y Issue z View a View b View a View b View a View b Issue z: The parameter used to represent the UE level assistance information is per MBS session, or per UE. View a: The parameter is per MBS session. View b: The parameter is per UE. Nokia ? ? Qualcomm ZTE Ericsson Huawei

  6. KI#2: Evaluation and Conclusion Option a: Use common TMGI among PLMNs to represent the same broadcast service Option b: Use Pre-configured TMGI relationship at NG-RAN node Option c: Use SSM to represent the same broadcast service 9.18.1 9.18.1 9.18.1 9.18.1 9.18.1 9.18.1 S2-2210253 S2-2210230 S2-2210324 S2-2210442 S2-2210758 S2-2210445 P-CR P-CR P-CR P-CR P-CR DISCUSSION Approval Approval Approval Approval Approval Discussion 23.700-47: KI#2, Update on Conclusion on 5MBS MOCN Network Sharing. Ericsson 23.700-47: Updates to Evaluation and Conclusion for key issue 2. 23.700-47: KI#2, update the conclusion for the Key issue#2. 23.700-47: KI#2: Conclusion update. 23.700-47: Conclusions for KI#2. KI#2: Discussion and way forward proposal. Nokia, Nokia Shanghai Bell, ZTE Huawei, HiSilicon Qualcomm Incorporated Huawei, HiSilicon Option a Option b Option c Nokia Qualcomm ZTE Ericsson Huawei

  7. KI#3: Evaluation and Conclusion View a: Nothing to be normalized View b: Adopt Solution #11 View c: Adopt option a of Solution #30 9.18.1 9.18.1 S2-2210231 S2-2210254 P-CR P-CR Approval Approval 23.700-47: Conclusion for key issue 3. 23.700-47: KI#3, Evaluation update and Conclusion. 23.700-47: KI#3 update to evaluation and conclusion. Nokia, Nokia Shanghai Bell, Ericsson, Qualcomm 9.18.1 S2-2210802 P-CR Approval China Mobile View a View b View c Nokia Qualcomm CMCC Ericsson

  8. KI#5: Evaluation and Conclusion Option a: Adopt Solution #14 as the basis Option b: Adopt Solution #29, periodical option (using current mechanism?) Option c: Adopt Solution #29, deferred activation option 9.18.1 9.18.1 9.18.1 9.18.1 S2-2210854 S2-2210232 S2-2210255 S2-2210329 P-CR P-CR P-CR P-CR Approval Approval Approval Approval 23.700-47: Conclusions for KI#5. 23.700-47: Conclusion for key issue 5. 23.700-47: KI#5, Conclusion . 23.700-47: KI#5, updating the evaluation and adding the conclusion. 23.700-47: KI#5: Conclusion update. Qualcomm Incorporated Nokia, Nokia Shanghai Bell, Ericsson ZTE 9.18.1 S2-2210443 P-CR Approval Huawei, HiSilicon Option a Option b Option c Nokia Qualcomm ZTE Ericsson Huawei

  9. LS out proposals 9.18.1 S2-2210441 LS OUT Approval [DRAFT] Reply LS to RAN WGs regarding FS_5MBS_Ph2 [DRAFT] Reply LS on UE capabilities for MBS Qualcomm Huawei, HiSilicon 9.18.1 S2-2210761 LS OUT Approval S2-2210441 is to inform RAN WGs the conclusion of SA2.

  10. Solution updates 9.18.1 S2-2210234 P-CR Approval 23.700-47: KI#5, Sol#25 Update. Nokia, Nokia Shanghai-Bell ZTE 9.18.1 S2-2210327 P-CR Approval 23.700-47: KI#1, update the solution#6. 23.700-47: KI#1, update the solution#28. 23.700-47: KI#1 and KI#6, Sol#26 Update to address ENs. 9.18.1 S2-2210328 P-CR Approval ZTE 9.18.1 S2-2210823 P-CR Approval Nokia, Nokia Shanghai-Bell

Related


More Related Content