RHIC Run Coordinator Status: Physics Running Continues
RHIC Run Coordinator Status: Ru, Zr Physics continues running with few interruptions; only one long failure. Scheduled interruptions for maintenance and access ran for a long time. 4 Zr, 4 Ru stores. First CeC dedicated period completed. Looking ahead, physics running continues with APEX at 3.85 GeV Au on Wednesday, switching to 26.5 GeV Au for CeC on Thursday and Friday. Still ahead is the 13.5 GeV medium energy setup for collisions.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Normal dump Early dump Early dump Early dump Normal dump Normal dump Normal dump Abort LEReC, CeC access LEReC, CeC access U line CeC Au running Maintenance MD vacuum, Blue LLRF
RHIC Run Coordinator Status: Ru, Zr Physics continues running Few interruptions; only one long failure Scheduled interruptions (MD, maintenance, access) ran long 4 Zr, 4 Ru stores First CeC dedicated period completed
Looking Ahead Physics Running continues APEX Wednesday, 3.85 GeV Au Switch to 26.5 GeV Au for CeC on Thursday & Friday Still ahead: 13.5 GeV medium energy setup for collisions Courtesy P. Ingrassia