Room Activities and Technical Issues

activities in clean room n.w
1 / 4
Embed
Share

Explore the various activities in a clean room including writing procedure documents, repairing cameras, measuring reference systems, and more. Encounter technical challenges such as planarity issues and FPC hole misalignment.

  • Clean room
  • Technical issues
  • Procedures
  • Camera repair
  • Measurement

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Activities in Clean Room 1. Writing Assembling Procedure Document; 2. Camera is working well after repair; 3. Measuring of Reference Systems: Al bar and Ruby; 4. CP Planarity with vacuum; 5. Rotation of the HB on Tower 2; 6. Alignement of HS below the SF; module assembly skipped Two technical problems: 1. Not perfect planarity of the HB on Tower 2; 2. FPC holes not perfectly centered;

  2. CP Planarity with vacuum 0.290 0.270 0.250 0.230 0.210 0.190 0.170 y = -2E-05x + 0.2227 0.150 -800.000 -600.000 -400.000 -200.000 0.000 200.000 400.000 600.000 800.000 1000.000 0.030 0.020 0.010 average stdev max min delta -0.002 0.016 0.114 -0.033 0.147 0.000 -0.010 -0.020 -0.030 -0.040 -800.000 -600.000 -400.000 -200.000 0.000 200.000 400.000 600.000 800.000

  3. HS planarity in nominal position adjustement by lateral screws Nom. Nom.* 20 Samp 30 Samp -9.316 Average StDev Max Min Delta -9.301 0.000 0.079 0.102 -0.134 0.236 -9.263 0.102 -0.068 0.170 -9.108 -9.567 0.459 -9.019 -9.495 0.476

  4. Others Tasks 1. Vacuum system: Ricci is buying the inverter for the new pump; 2. Fake modules should arrive Thursday;