SB1 Program Progress & Benefit Highlights 2018

tab 65 n.w
1 / 9
Embed
Share

Explore the progress report on the Senate Bill 1 (SB1) Program from March to August 2018, including the implementation overview and benefit highlights of various programs such as SHOPP, TCEP, SCCP, LPP, and ATP, showing the number of projects and segments adopted by the California Transportation Commission.

  • SB1 Program
  • Progress Report
  • Benefit Highlights
  • California Transportation Commission
  • Infrastructure

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. TAB # 65 Senate Bill 1 (SB1) Program Progress Report to the California Transportation Commission March August 2018 by James E. Davis SB1 Program Manager

  2. SB1 Program Implementation 17 Months SB 1 Program Implementation SB1 Signed Gas Tax Implemented SB1 Workshops Held SB1 Guidelines Approved Program Applications Evaluated Programs Adopted Allocations Made Apr. 28, 2017 Nov. 1, 2018 40 + 6 Programs 4 Programs 5 Programs 7 Meetings 2

  3. SB1 SHOPP - Benefit Highlights State Highway Operations and Protection Program Pavement Culverts Bridges Traffic Management System Elements 4,600 Lane Miles 898 Each 292 Each 7,122 Each Program includes additional benefits that are not shown. 3

  4. SB1 TCEP - Benefit Highlights Trade Corridor Enhancement Program HOV / HOT Lanes Mixed Flow Lanes New Track Truck Climbing / Auxiliary Lanes Grade Separation / Rail Crossings 80 Lane Miles 34 Lane Miles 10 Miles 7 Miles 7 Each Program includes additional benefits that are not shown. 4

  5. SB1 SCCP - Benefit Highlights Solutions for Congested Corridors Program HOV / HOT Lanes Operational Improvements Local Road Improvements Bridges New Track 141 Lane Miles 57 Each 36 Each 11 Each 11 Miles Program includes additional benefits that are not shown. 5

  6. SB1 LPP (Competitive) - Benefit Highlights Local Partnership Program Competitive Transit Vehicles Local Road Improvements Intersection Modification HOV / HOT Lanes Grade Separation / Rail Crossings 59 Each 53 Each 27 Each 24 Miles 17 Miles Program includes additional benefits that are not shown. 6

  7. SB1 ATP - Benefit Highlights Active Transportation Program Bike Lanes Crosswalks Sidewalks Programs (Education, Encouragement, etc.) Plans 250 Miles 132 Each 67 Miles 219 Each 6 Each Program includes additional benefits that are not shown. 7

  8. CTC SB1 Programs Adopted Program Number of Projects / Segments SB1 Total Funding Project Value SHOPP 506 $ 6.8 B $ 10.8 B TCEP 28 / 41 $ 0.8 B $ 4.3 B SCCP 9 / 28 $ 1.0 B $ 3.2 B LPP-Competitive 27 / 34 $ 0.3 B $ 1.7 B LPP-Formulaic 67 $ 0.2 B $ 6.2 B ATP Total 147 $ 0.2 B $ 9.3 B $ 0.5 B B = Billions 8

  9. CTC SB1 Programs Allocated Program Programmed SB1 Funding Allocated SB1 Funding SHOPP $ 6.8 B $ 920 M TCEP SCCP $ 0.8 B $ 1.0 B $ 80 M $ 243 M LPP - Competitive $ 0.3 B $ 60 M LPP - Formulaic $ 0.2 B $ 93 M ATP $ 0.2 B $ 49 M Total $ 9.3 B $ 1,445 M B = Billions M = Millions 9