SERVER Industrial Park Project Grupo Entercon-ALVAMA Developers
The Paycheck Protection Program (PPP) was introduced in response to the COVID crisis, providing forgivable loans to small businesses with fewer than 500 employees. The original loan amount is based on 2.5 months of average salary plus employee benefits, with limitations in place. For sole proprietors and partnerships, specific income calculations apply, allowing for financial support during challenging times. The program has undergone various legislative changes to support small business recovery effectively.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
SERVER Industrial Park Project Grupo Entercon-ALVAMA Developers
Project The project is located at an strategic location in the city of Arteaga Coahuila. On the Oscar Flores Tapia Blvd. The project is located in a 50,000 m2 lot (530,000 ft2) The warehouse area will be around 25,000 m2 (260,000 ft2), that could be divided in 20 units of 1,250m2 ( 13,000 ft2). The first stage of the project will be 6 units of 1,250 m2 each totaling around 7,500m2 the first stage of the project is completely finished. We are starting the 2ndstage of 4 sections, totaling 5,000m2. We will finish the front part of the project. We could accelerate another stage of our project, in other to fit the specific needs of our customers.
Technical Details Structural construction will be based in rigid frame and Joist. Sealing plate KR18 with 5% of natural light. 15 cm (6 inches) of concrete with metallic fiber. Concrete Walls Security Station Energy Saving illumination Space for trucks maneuvers Parking lot Green areas Fire protection system Each of the section will have: 9m minimum height and 11 m maximum Ramp for forklift access Loading ducks Machine rooms
Our Company We have decades of experience on the industrial real estate business, and we are capable to satisfy the different needs our customers might have. Our projects are designed to be flexible and we can adjust. We are looking for long term successful relationship always focus on WIN- WIN