Shaffer Landfill Remediation: EPA Project Manager Don McElroy
Explore the remediation project at Shaffer Landfill managed by Don McElroy, EPA Region 1 Remedial Project Manager. The capping of the landfill involved various steps like subgrade soil placement, membrane liner installation, and construction of stormwater systems, gas collection wells, and perimeter fence. View images and contact information.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Source: http://billerica.wickedlocal.com/ IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager
Shaffer Landfill Remedy The capping of Shaffer Landfill involved: Placement of subgrade soils over regarded waste providing: 5% grade on top deck Smooth subgrade surface on side slopes Installing textured membrane liner over entire landfill Installing synthetic drainage layer (drain net) over entire landfill Installing filter fabric over drainage layer Installing 18 of soil as top layer (to be seeded) Construction included: Stormwater conveyance systems and detention basins Combined landfill gas and leachate collection wells Landfill gas flare Perimeter fence. 3
Contact Information Don McElroy EPA Region 1 mcelroy.don@epa.gov (617) 918-1326 6