Sign Management Project Overview
This project focuses on establishing a comprehensive sign management system to ensure compliance with MUTCD standards for maintaining sign retroreflectivity. The Kentucky Transportation Cabinet (KYTC) aims to develop a statewide program that optimizes resources, minimizes costs, and enhances safety by efficiently managing traffic signs. The key objectives include creating sign inventories, implementing retroreflectivity management methods, and utilizing tools like Sign Click and Photolog Van. A dedicated team comprising professionals with expertise in sign inventory, installation, technology, retroreflectivity, and project steering is entrusted with executing the project tasks effectively.
Uploaded on Mar 08, 2025 | 0 Views
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
SIGN MANAGEMENT PROJECT Section Engineers Meeting Lake Cumberland March 2010
MUTCD MANDATE Agencies have until January 2012 to establish and implement a method to maintain minimum levels of sign retroreflectivity Compliance date for regulatory, warning and ground mounted guide signs is January 2015 Compliance date for overhead guide signs is January 2018
KYTC NEED Accurate, reliable and cost effective method to evaluate traffic signs Objective is to minimize costs, reduce liability, improve safety and comply with MUTCD standards
MISSION Develop of statewide sign management program that will meet FHWA requirements and serve as a model for a more extensive KYTC asset management program
SIGN MANAGEMENT SYSTEM Identify worn out signs Minimize requirements for field inspections Plan and budget resources properly Useable as liability defense Compliment existing inventory sets Anticipate future needs
MAJOR TASKS Create inventory of existing signs Collect inventory on newly installed signs Determine ultimate retroreflectivity management method that will be used once program fully developed Determine intermediate retroreflectivity management method that may be needed temporarily in order to meet MUTCD deadlines
TOOLS Sign Click Photolog Van and Database OMS Mobile OMS Field Data Collection Devices Area Development Districts Barcoding or RFID
TEAMS Steering Committee Jon Wilcoxson Existing Sign Inventory Chad Shive New Sign Installation Tracy Nowaczyk Technology Chad Shive OMS Aaron Collins Retroreflectivity Tracy Nowaczyk