Slice Test

Slice Test
Slide Note
Embed
Share

Involves installing a loaded half ring into a half cylinder with connected services and low z-support. Questions on mechanics/services and electrical tests to be conducted for the project. Planning discussions with stakeholders and minimizing design work for the test. Considerations for reusing mockups for slice tests and initiating discussions with stakeholders within 3-6 months.

  • Delivery
  • Installation
  • Support Services
  • Testing
  • Collaboration

Uploaded on Feb 15, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Slice Test Helen Hayward

  2. 15/02/2025 Helen Hayward - Virtual-Frascati 2

  3. So what do we need to deliver? A loaded half ring installed into a half cylinder with: connected associated services Low z-support Our half cylinder should be installed inside the support cylinder/wedge for the OB services First test of their service routing around the EC? If we only have one half cylinder: Is it vertical? Horizontal? (need to co-ordinate with OB Do we have to support the zippers? (instead of having the other half cylinder to support it? Can we easily install/remove the ring and connectors? What should the cradle/support tooling be? 15/02/2025 Helen Hayward - Virtual-Frascati 3

  4. Questions: Mechanics/Services Do we want ring 1 in a full length L4 half cylinder, or 60 cm prototype? What length do we want for the attached services What about the cooling manifold? Can we design it to enable future upgrade of parts? ITkPix1 loaded half ring? PP1 / High Z end support? 15/02/2025 Helen Hayward - Virtual-Frascati 4

  5. Questions: Electrical What tests do we want to run ? G+S? X-talk, Data transmission (Clearly this list is in conjunction with OB) Will we re-cable ring 1 when it arrives at CERN, or will it be tested in the Liverpool in the same cables to be used for any slice test? How do we get from ring 1 in test box, to installed ring 1 in half cylinder Can we connect and reconnect connections to ring 1? If we assemble EC slice in UK, what tests do we want to do before shipping to SR1? (What time will we have to do these tests?) Will Lukasc be working by December? Silicon contamination / virus delays 15/02/2025 Helen Hayward - Virtual-Frascati 5

  6. Summary Should keep in mind for Ring 1 and other mockups if they can be reused for the slice test. How can we minimize design work for this test? Should start discussions with OB in 3-6 months . 15/02/2025 Helen Hayward - Virtual-Frascati 6