Solaris Status Report - Wojciech Kitka & CS&IT Group - 22.06.2016

Solaris Status Report - Wojciech Kitka & CS&IT Group - 22.06.2016
Slide Note
Embed
Share

Solaris team's status update presented by Wojciech Kitka on behalf of the CS&IT group, covering the progress of Solaris including the machine overview, beamlines, experimental milestones achieved, and team members involved in various aspects of the project.

  • Solaris
  • Status Report
  • Wojciech Kitka
  • CS&IT Group
  • Solaris Team

Uploaded on Feb 16, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse, 22.06.2016

  2. Outline Solaris status People Control System at Solaris Summary 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 3

  3. The Machine Overview Solaris is a replica of the MAX IV 1.5 GeV Storage Ring. Injector: - 550 MeV linear accelerator - Thermionic electron gun - 6 S-band normal conducting structures Storage Ring: - Energy: 1.5 GeV - Current: 500 mA - 12 straight sections 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 4

  4. Beamlines BL-04BM PEEM/XAS advanced installation Bending magnet based In assembly EMITEC end-station XAFS endstation BL-05ID UARPES - commissioning Turnkey delivery by Elettra Undulator ID Control system commissioning (Cosylab) PREVAC end-station PHELIX new beamline I1011 beamline from Max-Lab 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 5

  5. Solaris status (1) June 2015: - first turn, - electrons stored in Storage Ring 5.2 mA, 490 MeV. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 6

  6. Solaris status (2) November 2015: - nominal optics, - electrons in Storage Ring reached 100 mA and 1.5 GeV. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 7

  7. Solaris status (3) May 2016: - first experiments on UARPES beamline. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 8

  8. Solaris status (4) June 2016: - electrons in Storage Ring reached 400 mA and 1.5 GeV, - lifetime: 100 min 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 9

  9. People Ada, Arek, Maciek (CERN) (diagnostic group) Krzysztof, Piotr Ga. High level software Machine Protection System Diagnostic instumentation Personal Safety System Tadeusz Building Management System Information and data sources Micha , Piotr K. management IT infrastructure and services Piotr Go. Help-desk Coordination ukasz . (MAX-IV), ukasz D. (50%), Virtual accelerator Wojciech (50%), Grzegorz (50%), Krystian Students (50%) non-critical tasks Control system software GUIs Outsorced Tango and students software helper tools development coordination Julia (PhD. student in IT, 30% of time) General software development Database applications 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 10

  10. Control System at Solaris (1) 3 instances of Tango: - one for a linac and a storage ring, - one per each of two beamlines. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 11

  11. Control System at Solaris (2) CS upgrade in December 2015 (only for the machine): - Tango 8 -> Tango 9 - CentOS 6.5 -> CentOS 7 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 12

  12. Control System at Solaris (3) Tango Community tools in Solaris: Tango 9 (machine) / Tango 8.1.2 (beamlines), Taurus, HDB/TDB/SNAP/Bensikin/Mambo, Sardana, Device servers, 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 13

  13. Status summary Commisioning stage The machine is integrated Integration of beamlines Preparation for users Challenges: Small team Some technical issues: crashes of DS for Danfysik power supplies 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting 14

  14. Thank you! References: Special credits to Darren Spruce and the whole MAX-IV KITS group