Southeast Dairy Business Innovation Initiatives - Grants for Dairy Businesses

Download Presenatation
Southeast Dairy Business Innovation Initiatives - Grants for Dairy Businesses
Slide Note
Embed
Share

The Southeast Dairy Business Innovation Initiative (SDBII) offers grants to support value-added dairy production in states like Alabama, Arkansas, Florida, and more. The program aims to diversify dairy product markets, reduce risks, and develop higher-value uses for dairy products. Businesses operating permitted dairy farms or processing facilities in eligible states can apply for funding. The initiative focuses on fostering innovation, business development, and regional milk production. Available grants include the Specialty Processing Equipment Grant and Dairy Business Planning Grant. Reach out to program contacts for assistance in Tennessee, Alabama, Florida, and Louisiana, as well as other states.

  • Dairy grants
  • Business innovation
  • Value-added products
  • Southeast region
  • Dairy processing

Uploaded on Apr 04, 2025 | 18 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Informationand hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator/ 06.10.2020 Information and hints for AOs 1 By ANS CZ Otto Olej / Flow Analyst, National RAD Coordinator

  2. 2 Informationand hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator/ 06.10.2020 In general - Explanations, hints and tips based on flight planning in LK airspace - PLANNING issues - Possible RAD solutions, but mostly marginal and not comprehensive - Before making RAD more complex, we re trying to get rid of the problems by offering correct routes to AOs - SW ALGORHYTHMS causing planning issues (?) - INFORMATION SOURCES - Information can be found on czech AIM website, part FRACZECH - Planning possibilities graphically represented in interactive tool FRAview

  3. 3 Informationand hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator/ 06.10.2020 Planning Unnecessary intermediate points - AOs plan intermediate points, which are not needed - Unexpected and potencionally dangerous FPLs - Some cases may be result of cost-effectiveness (wind)

  4. 4 Information and hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator / 06.10.2020 Planning FRA (E/X) points planned as FRA (I) - AOs plan two following border points - Does not adhere with AIP, IFPS functionality preventing this not implemented yet - Unexpected and potentionally dangerous FPLs

  5. 5 Information and hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator / 06.10.2020 Planning ARR LKPR descent in LO to avoid RAD - AOs planned descent below FL245 in LO airspace to avoid RAD in LK - The operational intention is not to descend, traffic H/O at high level - Examples (FPL-WZZ28-IS -A21N/M-SDE1E2E3FGIJ1J4RWXY/LB1 -LICC1020 -N0445F380 RCA Q58 PIGER DCT VEGAN DCT XOLTA DCT NIVES DCT PETOV/N0396F240 DCT LANUX DCT TABEM DCT VLM -LKPR0212 EDDC -PBN/A1B1C1D1L1O1O2S2 DOF/210907 REG/HALVR EET/LIBB0032 LDZO0050 LQSB0108 LDZO0112 LJLA0122 LOVV0125 LKAA0145 CODE/471F3F RVR/075 IFP/MODESASP OPR/WZZ ORGN/EDDFWZZX PER/C RMK/TCAS FOO CONTACT +3617779350) (FPL-ELY2523-IS -B739/M-SADE2E3FGHIJ1LORVWXY/LB1 -LLBG1455 -N0463F360 SUVAS N128 OTHON UN128 RIKSO/N0459F360 UN128 LMO DCT EVIVI L863 OKANA DCT RAVAK DCT TONDO DCT BEGLA/N0403F240 DCT LANUX DCT TABEM DCT VLM -LKPR0344 EDDC -PBN/A1B1D1L1O2S2 DOF/210902 REG/4XEHA EET/LCCC0010 LGGG0044 LTBB0107 LGGG0128 LBSR0158 LYBA0212 LHCC0245 LOVV0305 LKAA0318 SEL/ADEH CODE/738050 RVR/200 IFP/MODESASP OPR/ELY ORGN/LLBGELYW PER/D RMK/ACAS II EQUIPPED TCAS) NAVTI DCT BODAL DCT VLM - Plan RFL according to operational intentions

  6. 6 Information and hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator / 06.10.2020 Planning DEP LKPR initial level - In many cases AOs planned low initial RFL in field 15 - F < 165 caused by misunderstanding of FRA relevancies in AIP - F < 95 caused by planning SW sticking to low ATS route (published up to FL95), instead of finding FRA routing possibility above - Examples (FPL-RYR4069-IS -B738/M-SDGIJ1LRWYZ/SB1 -LKPR1005 -N0324F150 ARTUP DCT LAGAR/N0382F270 T871 GODLO DCT MAPIK -EPKK0052 EPWA EPKT -PBN/B1B5D1D3O1S2 NAV/RNP2 COM/TCAS DOF/210712 REG/SPRKE EET/EPWW0018 CODE/48C124 RVR/200 IFP/MODESASP OPR/RYS ORGN/DUBOEFR PER/C RMK/CONTACT +353 1 9451990 TCAS) F270 ARTUP DCT LAGAR (FPL-ASL79C-IS -AT72/M-SDFGHLORVY/S -LKPR0735 -N0277F090 VOZ T709 BODAL L726 BNO M748 ODNEM/N0270F190 M748 BERVA P974 XOMBA DCT BABIT T23 RIGMU -LYBE0155 LRTR -PBN/B2B3D2S1 DOF/210920 REG/YUALO EET/LZBB0034 LHCC0054 LYBA0119 RVR/300 OPR/ASL ORGN/EDDFASLX PER/B RMK/TCAS, ASL OCC 00381112098360) F190 VOZ DCT BODAL DCT ODNEM - Plan RFL according to operational intentions

  7. 7 Information and hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator / 06.10.2020 SW ALGORHYTHMS - I m not deeply familiar with planning SWs and the algorhythms, but I believe previous cases are result of them - Planning SW sticks to known segments - Can t freely find FRA options based on RAD and FRA point relevancies - Results in planning unecessary intermediates or avoiding the airspace completely (if the SW knows no route) - Planning SW sometimes prefers ATS routes before FRA - Where ATS routes are up to certain level (LK below FL95), results in planning YoYo flights or low initial level for DEPs - Leads to unefficient flight-planning - Are similar troubles in other units? - How will this work with dynamic RAD?

  8. Information and hints for AOs / Otto Olej / Flow Analyst, National RAD Coordinator / 06.10.2020 Thank you 8 olej@ans.cz fra@ans.cz

Related


More Related Content