
Southwest Power Pool Annual Savings and Benefits Report
Discover how Southwest Power Pool collaboratively saves billions annually through efficient operations, reliability, market integration, and transmission planning, leading to significant return on investment and cost-benefit ratio.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
2021 MEMBER VALUE STATEMENT Working together to responsibly and economically keep the lights on today and in the future. SPPorg southwest-power-pool 1 SouthwestPowerPool
2021 MEMBER VALUE In 2021, Southwest Power Pool provided $2.70 billion in savings and benefits to our members. 2
$2.70 BILLION ANNUAL SAVINGS AND BENEFITS Operations and Reliability: $878.8 million SPP operates from a regional perspective. This reduces costs and required energy reserves and increases efficiency. Markets: $1.4226 billion SPP s Integrated Marketplace combines efficient and economic day-ahead, real-time and transmission markets. Transmission: $376.9 million SPP s collaborative, stakeholder-driven transmission planning processes result in robust infrastructure and have rapidly and reliably integrated renewables. Tariff, Scheduling and Services: $37.8 million SPP s industry-leading services and training meet the compliance, settlements, engineering, tariff and scheduling needs of our customers on a regional scale. 3
18:1 RETURN ON INVESTMENT $1.4226 billion 18 TO 1 BENEFIT-TO-COST RATIO $925.0 million $878.8 million -$149.0 million $37.8 million -$548.1 million -$20.5 million Net Revenue Requirement Tariff, Scheduling & Services Operations & Reliability Markets Transmission (Benefits & Savings) FERC & 2021 ATRR for 2015-2019 projects Scheduling Fees COSTS BENEFITS ($2.70 billion) Transmission (Revenue Requirement) 4
A HISTORY OF VALUE $3480 M $2980 M $2.70 B $38 M $377 M $2480 M $2.24 B $2.14 B $37 M $38 M $1980 M $1.78 B $1.71 B $30 M $768 M $985 M $30 M $1423 M No MVS calculated in 2019 as SPP conducted a methodology improvement $1480 M $651 M $683 M $980 M $744 M $728 M $592 M $546 M $480 M $879 M $604 M $525 M $509 M $477 M -$20 M 2016 2017 2018 2019 2020 2021 Operations & Reliability Markets Transmission Professional Services FERC Fees Total 5