Space Vector Three Phase Inverter & Quality Monitoring

Space Vector Three Phase Inverter & Quality Monitoring
Slide Note
Embed
Share

This project presents a Space Vector Based Three Phase Inverter designed for an Induction Motor, focusing on power quality monitoring. The system aims to detect signals in real-time and analyze harmonics to enhance power quality. The team introduces a solution where the inverter generates reactive power to improve grid connection. Various diagrams and images illustrate the block diagram, flow diagram, problem statement, and proposed solution of the project, showcasing its significance in power quality improvement.

  • Space Vector
  • Three Phase Inverter
  • Power Quality Monitoring
  • Harmonic Analysis
  • Real-Time Detection

Uploaded on Mar 12, 2025 | 13 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Group No: 11 Space Vector Based Three Phase Inverter for an Induction Motor and its Quality Monitoring. Project Advisor: Dr. Syed Abdul Rehman Kashif Department of Electrical Engineering, University of Engineering and Technology, Lahore Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  2. Team Introduction Muhammad Irfan 2013-EE-132 Specialization: Power Ibrar Ahmad (Team Leader) 2013-EE-127 Specialization: Power N K T Katuwawala 2013-EE-149 Specialization: Power M Haris Khan 2013-EE-140 Specialization: Power Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  3. Problem Statement There is an ever increasing need for power quality monitoring systems owing to the growing number of sources of disturbances in AC power systems. Poor power quality affects the functioning of utilities, industrial units, productions, system performance, customer services and operating cost. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  4. Proposed Solution A real-time signal detection and harmonic analysis is of great significance to provide power quality solutions. Three phase inverter based motor drives basically generates reactive power which if connected to grid via inductor improves the quality of power . Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  5. Block Diagram Three Phase Inverter DC Source Sensors M Power Monitor Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  6. Flow Diagram START DC Source Motor Inverter Controller Display Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  7. Any other point Add any other thing you want to share Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  8. Applications Space Vector pulse width modulation based inverter basically reduce the total harmonic Distortion and improves the power quality and performance of motor. Increase in amplitude of maximum possible voltage because amplitude of Vmax in case of SVPWM is 90% of square wave as compared to 78% of square wave in case of SPWM. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  9. Applications In variable Frequency Drive( SVPWM is the best technique to control the speed of motor ). SVPWM has been widely applied in the current control of three-phase voltage source inverters (VSIs). Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  10. Audience The different Industries are main audience of our project. We will make our complete setup as a single portable unit so that this can be applied for houses at a cheaper rate. We will market our product to make it available to the users. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  11. What we have done so far?: Initially, we simulated 180 degree conduction mode of Three Phase Inverter. Then we started making PCB of Three Phase Inverter. We have now completed the hardware of three phase inverter. Our PCB can also be used as a Single Phase Inverter. We are also monitoring different electrical parameters. Now we are moving for SVPWM technique for Three Phase Inverter. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  12. 3D Model of Three Phase Inverter Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  13. Hardware Developed Hardware of Three Phase Inverter. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  14. Hardware Developed Hardware Setup of Three Phase Inverter. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  15. Future Deliverables After debugging and completion of Three phase inverter with load (Induction Motor),we will be moved towards Power Quality Monitoring. Different electrical parameter will be monitored. Plotting of output waveforms and calculation of different factors on the basis of these waveforms will be done. Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  16. Continued We will add a feedback loop to the microcontroller that will fix the values that will exceed the specified threshold on the basis of suggested solution. It will automatically suggest the actions to the User as well based on its algorithm. LabVIEW program for power quality analysis will be formulated and its performance will be verified with non-linear loads.

  17. Gantt Chart 2016 2017 September November December February Task Time Task October January August March May April April June May July Project Proposal Real Time plotting Inverter Quality monitoring Documenta tion Undergraduate Final Year Project Presentation Dated: 4th November, 2016

  18. References Research Papers (In proper IEEE format) http://www.worldtradereview.com/news.asp?pType=N &iType=A&iID=177&siD=20&nID=39752 https://www.smartdraw.com/flowchart/flowchart- symbols.htm Undergraduate Final Year Project Presentation Dated: 4th November, 2016