SPSRB Project Plan Template Instructions
A guide for documenting funded product development efforts in a Project Plan, used for seeking funding and conducting Annual Product Reviews. The template outlines the process for implementing new or enhanced products/services, including project milestones, funding details, and team roles.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
SPSRB Project Plan Template Instructions / Guidance A SPSRB goal is for every funded product development effort responding to a user request be documented in a SPSRB Project Plan. After the SPSRB approves the proposal for product development, the initial project plan will be drafted and used when seeking funding at the Annual Product Review Every summer OSGS leads a polar-orbiting and geostationary Annual Product Review where funding for existing and new projects are determined. All projects for funding consideration will develop a project plan using this template. Routine modifications to an existing product or service that is handled through the NESDIS OSPO change management process does not have to develop a project plan, unless directed by OSPO management or requested by the SPSRB. STAR/OSPO/OSGS will develop a process to update the plans annually. In addition, projects will be periodically reviewed by management. These reviews will include assessment of all issues impacting the execution of the project. This template will be used by NESDIS project leads to outline their plan to implement a new or enhanced product or service into operations. Occasionally, NOAA will stop a capability at a pre-operational phase. For example, a product from a research satellite may not go all the way to a full 24/7 operational phase. In such cases, this template will also be used to document plans to develop a new or enhanced product/service where the effort will end at the pre-operational development phase (i.e., we have reached our end- state for this capability). The template is a guide and may require tailoring. However, adherence to the briefing outline is recommended because it ensures the SPSRB and Office management is presented with the information needed to make decisions. Additional guidance is contained on the note pages. You can access the notes page by selecting View and Notes Page from the main menu. You can also print the slide with notes by selecting File , Print and select Notes Pages under the Print What option. Prior to submitting final version of a project plan to NESDIS Satellite Product Manager (Tom Schott), ensure it is coordinated at the IPT level and ensure your office division chief approves the plan. If you are tasked to do a project plan briefing at a SPSRB, the briefings are due the last Friday of the month. The presentation will be at the SPSRB which meets on the 3rd Wednesday of every month. Send briefing to Priyanka.Roy@noaa.gov and info copy David.R.Donahue@noaa.gov and Eileen.Maturi@noaa.gov Delete this slide before you send your brief to funds manager or the SPSRB secretaries 1 V16 20 Apr 2015
SPSRB Project Plan title Presenter: Name and office * IPT Lead: Name and office * IPT Backup Lead: Name and office Month day, year * If project is funded, leads will be responsible for management reporting on the secure SPSRB web site V16 20 Apr 2015 2
Outline Integrated Product Team (IPT) Requirements Capabilities Assessment IT System Architecture Plan of Operations Project Milestones Funding Spending Plan and Tasks 3 V16 20 Apr 2015
Integrated Product Team (IPT) IPT Lead: IPT Backup Lead: NESDIS Team: STAR: OSPO: OSGS: NCEI: Others: User Team Lead: Others: Oversight Panel (OP) lead: Other OPs involved: 4 V16 20 Apr 2015
Requirement(s) Requirement(s) SPSRB requirement number, title and summary of requirement Others User community Benefit to user NOAA Mission Goal supported: Mission priority: 5 V16 20 Apr 2015
Capabilities Assessment Current Operational Capabilities Requested Capabilities Proposed Operational Capabilities Satellite Source (s) Environmental Observational Parameter Accuracy Latency Timeliness Coverage Resolution Other attributes 6 V16 20 Apr 2015
Capabilities Assessment (Continued) Current Operational Shortfalls Timeliness Accuracy of Product Define how product development addresses shortfalls Impact if project is not funded 7 V16 20 Apr 2015
Algorithm Status and Approach Current status of algorithms being considered in your project Include some details on peer reviews Include expected performance Overview of technical approach of the algorithm and its implementation Include brief technical description Ancillary data requirements Concept of operations (e.g. for each orbit level 1b radiances are read, ancillary data is read, algorithm is applied to level1b using ancillary data for initial guess, generated output is converted to several formats, output sent to server for distribution) Briefly describe the validation concept Include ground truth data used in validation Metrics for assessing performance Independent user assessments 8 V16 20 Apr 2015
IT System Architecture Backup Dissemination User System Operational Satellite Data from ? ESPC h/w, ftp? ESPC h/w? ESPC h/w ? h/w? Ancillary Data from ? Development Ancillary Data ORA or OSPO h/w? Input Data Includes: ???? 9 V16 20 Apr 2015
Research and Operational System Environments Project Name: IT Item Research Operations Agency Platform(s) and need dates Operating Systems Programming languages/compilers * Scripting languages Graphical/Imaging programs, COTS S/W, other tools, libraries, etc Helpdesk Monitoring Tool (standardized tool or customized tool?) Other platforms needed for monitoring/imaging/graphics (specify platform & operating system) Other (tools, shareware, libraries, critical non-static ancillary data, etc) * ESPC Target Architecture is either IBM P-series or X86 with virtualization ** ESPC target OS is either AIX, AIX with a Red Hat Linux LPAR (64-bit), or Red Hat Linux for X86 (64-bit) *** IDL and MATLAB are not supported in ESPC for science algorithm processing, only for post-processing tasks Red font indicates new IT resource requirements for this project Blue font indicates existing IT resources will be used for this project V16 20 Apr 2015 10 10
Operational Agency System Requirements Project Name: Back-up Operations IT Item Development Operations On-Site Off-Site Agency Platform(s) and need dates (include secondary platforms for monitoring, imagery or graphics, if necessary) Storage required on systems How often does system run (granule time, orbital, daily); event or schedule driven? Memory used at run time Input data volume and input data sources Data volume for distribution; planned distribution server; specific push users & volumes N/A Communication Requirements/Protocol Days to retain input and output data Red font indicates new IT resource requirements for this project Blue font indicates existing IT resources will be used for this project 11 11 V16 20 Apr 2015
Research and Operational System Environments Project Name: PROJECT NAME GOES HERE IT Item Research Operations Agency STAR OSPO (ESPC) 3 Dell Blade Servers w/ 8 Gigs of RAM Jun 2008 IBM P6-570 2 Nodes Aug 2010 Platform(s) * and need dates Red Hat Linux AIX Operating Systems ** FORTRAN, C, C++, IDL, C-shell, Oracle Database C/C++, PGI FORTRAN Programming languages/compilers *** PERL JAVASCRIPT Scripting languages IDL GIMP,GDL Graphical/Imaging programs, COTS S/W, other tools, libraries, etc TBD ALTERIS BMS 2008 Helpdesk Monitoring Tool (standardized tool or customized tool?) None GNOME Other platforms needed for monitoring/imaging/graphics (specify platform & operating system) GRIB/GRIB2/NetCDF USER EPHEMERIS DATA Other (tools, shareware, libraries, critical non-static ancillary data, etc) * ESPC Target Architecture is either IBM P-series or X86 with virtualization ** ESPC target OS is either AIX, AIX with a Red Hat Linux LPAR (64-bit), or Red Hat Linux for X86 (64-bit) *** IDL and MATLAB are not supported in ESPC for science algorithm processing, only for post-processing tasks Red font indicates new IT resource requirements for this project Blue font indicates existing IT resources will be used for this project 12 12 V16 20 Apr 2015
Operational Agency System Requirements Project Name: PROJECT NAME GOES HERE Back-up Operations IT Item Development Operations On-Site Off-Site Agency STAR OSPO (ESPC) CIP 3 Dell Blade Servers w/ 8 Gigs of RAM Jun 2008 IBM P6-570 2 Nodes Aug 2010 IBM P6-570 2 Nodes Need date TBD Platform(s) and need dates (include secondary platforms for monitoring, imagery or graphics, if necessary) 3 TB (1 TB per server) SAN 10 TB SAN is mirrored and redundant Storage required on systems Hourly Orbitally (16 per day) Orbitally (16 per day) How often does system run (granule time, orbital, daily); event or schedule driven? 24 GB 75 GB 75 GB Memory used at run time 4 GB per day 12 GB per day 12 GB per day Input data volume and input data sources 4 GB per day 4 GB per day N/A Data volume for distribution; planned distribution server; specific push users & volumes Internet ESPC Data Distribution Server, FTP ESPC Data Distribution Server, FTP Communication Requirements/Protocol 3 2 2 Days to retain input and output data Red font indicates new IT resource requirements for this project Blue font indicates existing IT resources will be used for this project 13 13 V16 20 Apr 2015
Plan of Operations Product Retirement Plan Define if we will pursue the retirement of a product as a result of implementing a new or enhanced product under this project Archive Plan Define need for archive, archive location and duration of archive Define deliverables to archive (e.g., software, documentation, etc.) Define funding cost requirements Long Term Maintenance Plan Define STAR science maintenance plan and funding source Define OSPO maintenance plan and funding source Quality Monitoring Plan Define Quality Control (QC) tools to be developed/used Define who will use the QC tools Describe how the QC tools will be used Documentation/Metadata Plan Describe who will do documentation and metadata and what will be done User Involvement Plan Describe how you intend to get the user involved in project and how you will baseline their requirements for this capability (e.g., describe how you will collect user requirements and baseline requirements at PDR or a requirements review meeting) 14 V16 20 Apr 2015
Additional Guidance Delete this slide before submission of your project plan The next few slides show milestone templates. It is extremely difficult to capture a standard set of milestones because there are so many different types of development efforts. For example, Standard development for a new product Update/Upgrade to an existing product Develop multiple new products within a project This is where you might consider development/operational builds Milestones should consider the standard SPSRB task for the various phases and delete ones that are not applicable. Projects should add project unique milestones to these templates. 15 V16 20 Apr 2015
Project Milestones and Key Tasks (Complex Product Example) Product Delivery/Tracking Name: xxxxxxx MMM YY (mmm yy): Development Phase Begins MMM YY: IPT Lead informed to begin product development MMM YY: Initial Archive Requirements identified MMM YY: Quality Monitoring Concept Defined MMM YY: Long-term Maintenance Concept Defined MMM YY: Requirement Allocation document Review MMM YY:Preliminary Design Review MMM YY: Development processing system defined MMM YY: Initial Information Technology (IT) Security concept defined MMM YY: Test case processed MMM YY: Critical Design Review MMM YY: Code is prepared for implementation MMM YY: Final Archive requirements identified MMM YY: Operational and backup processing defined MMM YY: Unit Test Readiness Review MMM YY (mmm yy): Pre-operational Phase Begins MMM YY: Software Code Review MMM YY: Operational and backup processing capabilities in place MMM YY: Final IT Security Concept Defined MMM YY: Pre-operational product output evaluated & tested MMM YY: System/Algorithm Readiness Review MMM YY: Code transitions to operations; all documentation is complete MMM YY: Operational and backup capabilities reach ops status MMM YY: Operational Readiness Review MMM YY: Brief SPSRB Oversight Panel(s) on product status MMM YY: Brief SPSRB capability is ready to go operational MMM YY (mmm yy): Operational Phase Begins MMM YY: SPSRB declares product operational SPSRB Secretaries/manager update the SPSRB product metrics web pages OSGS updates Satellite Products database 16 V16 20 Apr 2015
Project Milestones and Key Tasks (Simple Product Example) Product Delivery/Tracking Name: xxxxxxx MMM YY (mmm yy): Development Phase Begins MMM YY: IPT Lead informed to begin product development MMM YY: Initial Archive Requirements identified MMM YY: Quality Monitoring Concept Defined MMM YY: Long-term Maintenance Concept Defined MMM YY: Requirements Allocation Document Review MMM YY: Development processing system defined MMM YY: Initial Information Security (IT) concept defined MMM YY: Test case processed MMM YY: Critical Design Review MMM YY: Code is prepared for implementation MMM YY: Archive process updated MMM YY: Operational and backup processing defined MMM YY (mmm yy): Pre-operational Phase Begins MMM YY: Software Code Review MMM YY: Operational and backup processing capabilities in place MMM YY: Final IT Security Concept Defined MMM YY: Pre-operational product output evaluated & tested MMM YY: System/Algorithm Readiness Review MMM YY: Code transitions to operations; all documentation is complete MMM YY: Operational and backup capabilities reach ops status MMM YY: Operational Readiness Review MMM YY: Update SPSRB Oversight Panel(s) on product status MMM YY: Brief OSPO capability is ready to operational MMM YY (mmm yy): Operational Phase Begins MMM YY: SPSRB manager and secretaries notified update/upgrade went into operations. SPSRB Secretaries/manager update the SPSRB product metrics web pages MMM YY: OSGS updates Satellite Products database 17 V16 20 Apr 2015
Product Deliverable Details Product Type and Number Fiscal Year (FY) Product Delivery/Tracking Name Environmental Observational Parameters Satellites Sensors N # E # R # T # O # Tailoring Options or Comments Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Formats: Coverage areas: Resolutions: Update cycle: Other: N=New E=Enhanced R=Replacement T=Tailored O=Other 18 V16 20 Apr 2015
Product Deliverable Details Product Type and Number Fiscal Year (FY) Product Delivery/Tracking Name Environmental Observational Parameters Satellites Sensors N # E # R # T # O # Tailoring Options or Comments FY10 Sea Surface Temperatures from AMSR-E Sea Surface Temperatures Aqua AMSR-E 1 9 Formats: PNG, NetCDF4 Coverage areas: 5 regions Resolutions: 40 km Update cycle: daily Other: N/A FY11 Sea Surface Temperatures from AMSR-E Update Sea Surface Temperatures Aqua AMSR-E 1 9 Formats: PNG, NetCDF4 Coverage areas: 5 regions Resolutions: 40 km Update cycle: daily Other: N/A Total products = #formats x #coverage areas x #resolutions Total products = 10 = 2 x 5 x 1 FY10 get credit for 1 new and 9 tailored FY11 get credit for 1 enhanced and 9 tailored N=New E=Enhanced R=Replacement T=Tailored O=Other 19 V16 20 Apr 2015
Funding (K) Project Name Purchase Items FY15 FY16 FY17 FY18 FY19 Procurement Office Funding Source Totals => 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) xxx -- 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) STAR 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) STAR 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) STAR xxx -- Totals => 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) OSPO 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) OSPO 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) OSPO OSPO Base -- Totals => 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) S/W Licenses 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) OSPO H/W Maintenance 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) OSPO Sys Admin 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) OSPO STAR Base -- Totals => 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) STAR 20 V16 20 Apr 2015
FYxx Purchases and Tasks (xK of source): zz STAR Grant for # person at y% time from MMM YY to MMM YY Xxx Xxx (xK of source): STAR Software Contractor for # person at y% time from MMM YY to MMM YY Xxx Xxx (xK of source): OSPO Software Contractor for # person at y% time from MMM YY to MMM YY Xxx Xxx (xK of source): OSPO Hardware purchase on MMM YY xxx 21 V16 20 Apr 2015