Statistical Anxiety and Qualification-Focused Student Support at eSTEeM Annual Conference 2022

statistical anxiety will qualification focussed n.w
1 / 17
Embed
Share

Explore the impact of qualification-focused student support on statistical anxiety at the eSTEeM Annual Conference 2022 through the lens of scholarship success stories and innovation within the community. The study delves into the years M248 study commenced, qualifications studied, and the total student distribution across various subject areas.

  • Student support
  • Statistical anxiety
  • Qualifications
  • eSTEeM Conference
  • Scholarship success

Uploaded on | 2 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Statistical anxiety: will qualification focussed student support help? Rachel Hilliam, Carol Calvert, Emma Steele and Di Haigney Thursday 12thMay 10am eSTEeM Annual Conference 2022: Scholarship Success Stories Innovation Through Community

  2. What problem are we trying to solve? Year in which study of M248 commenced (Oct) 2017 2018 Qualification studied 2019 2020 2021 Qualification- based group M&S BSc (Hons) Mathematics BSc (Hons) Mathematics & Statistics BSc (Hons) Economics & mathematical sciences BSc (Hons) Economics BSc (Hons) Computing & IT with statistics BSc (Hons) Data Science 61 107 111 94 108 119 137 108 113 112 71 59 53 53 66 Economics 1 17 3 32 11 32 26 33 75 33 Data Science 5 4 18 67 200 Standalone module study 23 31 29 36 30 Open BSc (Hons) Open BSc (Hons) STEM Other qualifications 61 12 49 28 38 33 43 36 40 45 Combined 14 372 23 434 16 457 22 561 45 759 Total 2

  3. What problem are we trying to solve? 3

  4. Timeline of project Meetings with ALs to review qualification-based support and embed this into business as usual Meetings with ALs to explore how qualification- based support could be implemented Review meeting with ALs Student surveys, Feb 2020 and May 2020, to identify units in the module where more support would be needed Student survey, Dec 2020, to identify impact of qualification- based tutorials Summer 2019: Writing of economics specialist pre module start tutorial materials Regular analysis pointing to increase in Economic student numbers and lower pass rate for these students Summer 2020: Writing of limited number of qualification- based tutorial materials Summer 2021: Writing of more tutorial qualification-based tutorial material Oct 2017 Oct 2018 Oct 2019 Oct 2020 Rewrite of M248 module for Oct 2017 Launch of BSc (Hons) Economics and BSc (Hons) Data Science

  5. Pre-project changes for Economics students Pre-module start and exam Material written by an M248 AL who was an economist to offer pre-module support Handbook of techniques and examples to be used in two pre-module tutorials First two units available on M&S Study Site, plus conditional access to Minitab and Unit 3 Multiple choice element removed from the exam 5

  6. Timeline of project Meetings with ALs to review qualification-based support and embed this into business as usual Meetings with ALs to explore how qualification- based support could be implemented Review meeting with ALs Student surveys, Feb 2020 and May 2020, to identify units in the module where more support would be needed Student survey, Dec 2020, to identify impact of qualification- based tutorials Summer 2019: Writing of economics specialist pre module start tutorial materials Regular analysis pointing to increase in Economic student numbers and lower pass rate for these students Summer 2020: Writing of limited number of qualification- based tutorial materials Summer 2021: Writing of more tutorial qualification-based tutorial material Oct 2017 Oct 2018 Oct 2019 Oct 2020 Rewrite of M248 module for Oct 2017 Launch of BSc (Hons) Economics and BSc (Hons) Data Science

  7. Changes in Tutorial support Pilot for 20J Students assigned to an AL based on their qualification rather than on geography Introduced core and qualification-based tutorials ALs with non-M&S tutor groups provide few tutorials in order to spend more time supporting their tutor group 7

  8. Evaluation of changes in tutorial support Surveyed students asked to provide more day time tutorials and more qualification-based tutorials (addressed for 21J) Used data on access to recordings of tutorials to gauge areas students keep reviewing (more tutorials on these areas for 21J) 8

  9. Tutorial unit views Number of views of tutorials 19J and 20J cohort (multiple events per student) 800 700 600 500 Number 400 300 200 100 0 unit 1 unit 2 unit 3 unit 4 unit 5 unit 6 unit 7 unit 8 unit 9 unit 10 unit 11 unit 12 Revision views 19J views 20J 9

  10. Tutorial attendance and viewing Tutorial type Synchronous attendance per 100 students Viewing students per 100 Divisor 4.2 697.0 Number of students on M248 Number of students in the named qualification- based group Core 6.1 54.5 Qualification -based M&S 9.4 16.9 Qualification-based Economics 11.4 224.0 Qualification-based Data Science 8.2 331.0 Qualifcation-based Open 10

  11. Timeline of project Meetings with ALs to review qualification-based support and embed this into business as usual Meetings with ALs to explore how qualification- based support could be implemented Review meeting with ALs Student surveys, Feb 2020 and May 2020, to identify units in the module where more support would be needed Student survey, Dec 2020, to identify impact of qualification- based tutorials Summer 2019: Writing of economics specialist pre module start tutorial materials Regular analysis pointing to increase in Economic student numbers and lower pass rate for these students Summer 2020: Writing of limited number of qualification- based tutorial materials Summer 2021: Writing of more tutorial qualification-based tutorial material Oct 2017 Oct 2018 Oct 2019 Oct 2020 Rewrite of M248 module for Oct 2017 Launch of BSc (Hons) Economics and BSc (Hons) Data Science

  12. Student feedback Compared to previous modules I had studied, M248 was definitely the best in terms of tutor approach, forum discussion structure, efforts to make every student to feel inclusive, being aware that students come from different backgrounds, and reflecting this in tutor groups arrangements as well as specifically orientated tutorials. Thank you. 12

  13. Conclusions and our current focus Contributed to building a sense of community: some of the forums were very active Associate lecturers really appreciated having time to spend with their tutor group No need to encourage ALs to take non-M&S qualification-based groups in 21J Possible that the qualification-based approach might help with statistics anxiety 13

  14. Statistics anxiety anxiety which occurs as a result of encountering statistics in any form and at any level, involving a complex array of emotional reactions which hinder the learning process. (Vigil-Colet et al, 2008 p.175) 14

  15. Statistics anxiety versus mathematics anxiety Linguistic & data processing Uncertainty & inconsistencies Reasonable complex extrapolation 15

  16. Project plan Extend STARS etc using 6-8 students during summer 2022 Use adapted measure in 22J to identify types of anxiety Create intervention workshops for use prior to 23J and evaluate effect on statistical anxiety 16

  17. THANK YOU